<br />Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />~ Parking Level One
<br />I
<br />Gross Area
<br />Parkin~ _ _ _
<br />DEMOLITION
<br />remove utilities
<br />~ sanitary sewer
<br />~
<br />' storm
<br />water
<br />gas
<br />i hazardous material removal
<br />, Subtotal
<br />I - -- - - -- _ _ _ _ .
<br />TOTAL - DEMOLITION
<br />I SITE WORK _ _ __
<br />~ _ _ _
<br />I Building related earthwork
<br />temp. shoring @ perimeter
<br />parking area
<br />; mass excavation
<br />, bank cut
<br />'I fill under slab
<br />backfill against foundation
<br />' bus mall area @ sog
<br />' cut
<br />I~ fill
<br />~~ haul & dispose excess material off site
<br />j dewatering
<br />I elevator pit excavation
<br />structural (foundation) excavation
<br />footings
<br />~ ramp wall
<br />~ structural (foundation) backfill
<br />~
<br />~ footings
<br />ramp wall
<br />~, haul & dispose excess material off site
<br />level & grade
<br />', 4" gravel under slab
<br />! vapor barrier
<br />~ ~ ~ o ~ ~ ~ ~ w~ ^~ ~^^ ~^ ~ ^^~
<br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Portland, Oregon 97221 Print Time: 11:20 AM
<br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99
<br />- --- - - _
<br />---
<br />70,793
<br />_ - - . _
<br />. 70,793 sf .
<br />.,
<br />- - - _ _--
<br />Quantity Unit CosUUnit Cost Total Comments
<br />_ _ _ - -- - - - ---- -_ -- ---- -- - - _ ~
<br />370 If $6.00 $2,220
<br />340 If 6.00 2,040
<br />300 If 6.00 1,800
<br />370 If 6.00 2,220
<br /> sum 0.00 0
<br /> $8,280
<br />~8,280
<br /> sf 0.00 0
<br />70,793 sf
<br />12,821 cy 5.00 64,105
<br />1,823 cy 5.00 9,115
<br />628 cy 7.00 4,396
<br />3,039 cy 7.00 21,273
<br />42,745 sf
<br />106 cy 5.00 530
<br />1,983 cy 7.00 13,881
<br />9,100 cy 6.00 54,600
<br />1 sum 25,000.00 25,000
<br /> sum 0.00 0
<br />1,260 cy 15.00 18,900
<br />22 cy 15.00 324
<br />756 cy 18.00 13,608
<br />14 cy 18.00 245
<br />512 cy 6.00 3,072
<br />113,538 sf 0.10 11,354
<br />1,472 cy 13.00 19,136
<br />3,353 sf 0.15 503
<br /> 2,220
<br /> 2,040
<br /> 1,800
<br /> 2,220
<br /> 0
<br />$0 $0 $8,280
<br />$0 $0 $8,280
<br />NIC - By Others (if required)
<br />0.12
<br />0 NIC - assume not required
<br />64,105
<br />9,115
<br />4,396 w/ on site material
<br />21,273 w/ on site material
<br />530
<br />13,881 w/ on site material
<br />54,600
<br />25,000
<br />0 NIC w/ building
<br />18,900
<br />324
<br />13,608
<br />245
<br />3,072
<br />11,354
<br />19,136
<br />503 @ strg rm & elevtr Ibby only
<br />Parking Detail Estimate - Page 1