My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
__ .___ _- _- _ <br />_ _ - - - -- - --- _ _- <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 12:04 PM <br />Arbuckle Costic Architects, Inc Construction Start: S rin 99 <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 ____ __ ______ _ P_~_ <br />- - <br />_ _ _ -. _ _ _ _ _ _ <br />- - - <br />Comments <br />~Alternates ~ Quantit~ Unit CosUUnit Cost Total _ _ __ _ <br />- - <br />--- _ _ <br />~ MECHANICAL - - __ _ _ _ --- - - - - - - -- <br />HVAC <br />ventilation / exhaust system <br />19,467 sf 2.50 48,668 <br />ef-4 ea 0.00 0 <br />ductwork cfm 0.00 0 <br />controls ea 0.00 0 <br />~ <br />~ 0 <br />sum 0.00 _. _ <br />~ <br />balancing _ _ _ _ <br />__ _ _ _ <br /> 48,668 <br />Subtotal <br />Plumbing ~~~ <br />~ <br />00 <br />0 <br />I item <br />. <br />ea <br />- ___~ <br />_----- - --- __ __ -- ---__ <br />2.50 <br />0.00 <br />Subtotal <br />~ <br />, Fire sprinklers <br />dry system 19,467 sf 1.55 30,174 ___ ____ ___ <br />-_ ------- - <br />Subtotal ~ 30,174 1.55 <br />_- -_ - -- <br />I _ _ - -- <br />-- - <br />- -- ~78 841 j 4.05 <br />I TOTAL- MECHANICAL _ _ _._ ~-- -- -__ _-- _ . _ -- <br />ELECTRICAL - - -- - -- ---~i _.__ _ _-- <br />- - - I <br />_ _ - - - ----- <br />_ _ __ _ , <br />-- <br />- <br />~ basic materials & power distribution 19,467 sf 1.70 33,094 _ _ _ _ _ ____ _ _ _ ~ <br />- - -- <br />~ Subtotal 33,094 <br />-- - - - <br />--- -- -- <br />_ __. -- --- <br />i ---- _ --_ <br />-- -- <br />~ ~ . <br />__ _ - -- ' - - -- - ----~- -- _ - _ - <br />-__ <br />TOTAL ELECTRICAL _ <br />___- - _ __ <br />_ - <br />__ - <br />-__ _ -~-- ~__ _~ _ _l <br />'~ SUBTOTAL 686,950 5686,950; <br />-- - -- - --- - <br />GENERAL CONDITIONS 7.75% 53,239 <br />~~ 3.75% 27,757 <br />~, GENERAL CONTR. FEE <br />I ESTIMATING CONTINGENCY ~I 4.50% 34,558 <br />~ INDEX TO CONSTRUCTION START I, Spring 99 0.75% 6,019 <br />~~ <br />I'~ , --__ ____ _ <br />_ - <br />- - - -- <br />I - - -- _ <br />TOTAL DIRECT CONSTRUCTION COST <br />~I <br />' 19 467 sf ~41.53 <br />Parkin~ Alternate 2 , _~ __ - --- - <br />@ t 3% per year <br />121, 572 , <br />, <br />a808,522 i _ _ 5808,522 ~ <br />Alternates - Page 16 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.