My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ____ _ ___ _ -_ <br />--__ -- ------- - <br />- - -- _ _ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 12:04 PM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 __ _ ___ __ ___ __ Construction Start: Spnng 99 <br />__ -- - <br />-- - - - <br />-- ---- <br />___ - -__ -- <br />-- -- - Comments <br />~Alternates ] Quantit~i Und CosUUnit Cost Total _ _ _ _. _ _ -. -_ <br />-- -- __ _- <br />_ - - --- <br />_ -- _ <br />_ -- -- -__ _ _ --- ---- I <br />-- - __ --- - <br />Parking Altemate 2 - Continued <br />Concrete - Continued <br />finishing <br />set screeds 38,934 sf 0.20 7,787 <br />cure 38,934 sf 0.08 3,115 <br />seal 38,934 sf 0.06 2,336 <br />trowel 19,467 sf 0.60 11,680 <br />float slab 19,467 sf 0.40 7,787 <br />finish topping slabs <br />3" It weight 3,811 sf 0.45 1,715 <br />floatfootings 1,882 sf 0.40 753 <br />break ties 8~ plug voids @ walls 6,601 sf 0.55 3,631 <br />__ __----- - -- - ___ _______ __ ___.__ ____ __ <br />Subtotal 38,803 <br />Miscellaneous <br />11 <br />If <br />4.50 <br />50 <br />waterstop <br />rced slab on grade <br />i <br />f <br />6" (3,811) sf 4.00 (15,244) _____ __ ___-__ <br />n <br />o <br />re <br />Subtotal (15,195 <br />Precast Concrete <br />0 <br />ea <br />0.00 <br />0 <br />__ <br />___- _ NIC <br />precast wheel stops _ __ ____ <br />~ <br />Subtotal ~ <br />- - -- ---. - - - <br />- -- - __ _-- <br />_ __ _ 19.5 <br />-- _ - - - - <br />- -- <br />TOTAL - CONCRETE _ 38 , _-- - - -- -- - - --__- ----------- <br />- -- <br />- -- -- ---- <br />MASONRY - --- - ___ _ _- <br />Concrete Masonry Units (CMU) <br />6" partitions - -------_._- - --__ __ ._ <br />0 sf 8.50 . _ -- -- ---- - -- - <br />Subtotal ~ <br />_ .-__ ~o-~ - -- f _ _ - -I _ _ <br />_ __ - - <br />TOTAL- MASONRY ~~ <br />Alternates - Page 12 <br />~ ~ ~ r r ~ ~ ^~ ~ ^i r ~r ^~ r ~ ~ ~ ~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.