My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Third Floor <br />Total Area <br />Third Floor Tenant Finishes <br />--_ _. _ -- _ _ <br />-_____-- - - ___ -- - <br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Portland, Oregon 97221 Print Time: 11:42 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />_ -- -- - - -- . _ <br />28,279 _ _ _ <br />___ _ _ _ _ <br />28,279 sf sf <br />_ _ - ---_ ._- - -- _. _ _ _ _. _ _ <br />Quantity Unit CosUUnit Cost Total Comments <br />FINISHES - Continued <br />Carpet <br />rype 1 <br />type 9 <br />Subtotal <br />Paint & wallcoverings <br />paint / finish door & frame <br />paint / finish relite frames <br />paint gypboard ceilings <br />paint walls <br />vinyl wall covering <br />miscellaneous specialty painting <br />Subtotal <br />TOTAL - FINISHES <br />__ -__ <br />SPECIALTIES <br />Markerboards / Tackboards <br />markerboard <br />tackable surface <br />Subtotal <br />Signage Systems <br />signage <br />Subtotal <br />Fire extinguisher & cabinets <br />FEC <br />Subtotal <br />TOTAL - SPECIALTIES <br />69 sy 21.62 1,492 1,492 0 <br />3,094 sy 18.62 57,610 57,610 0 <br />59,102 59,102 0 <br />86 ea 60.00 5,160 5,160 0 <br />30 ea 40.00 1,200 1,200 0 <br />0 sf 0.60 0 0 0 <br />42,913 sf 0.45 19,311 19,311 0 <br />4,802 sf 1.50 7,203 7,203 0 <br />1 sum 1,500.00 1,500 1,500 0 <br /> 34,374 34,374 0 <br />~220,881 <br />ea 0.00 0 <br />500 sf 8.00 4,000 <br />- __ _- -- _. <br />4 <br />28,279 sf 0.12 3,500 <br />3 <br />5 ea 250.00 1,250 <br />-- -- - __ - - <br />1 <br />_ __.. -- - _ _ <br />~8 <br />7.81 <br /> 0 <br />4,000 0 <br />0 NIC-B <br />allowar <br />000 4,000 <br />3,500 0 <br />0 <br />allowar <br />500 3,500 <br />1,250 0 <br />0 <br />verify <br />250 1,250 0 <br />750 $8,750 $0 <br />Third Floor Tenant Improvements Detail Estimate - Page 4 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />y Tenant <br />ce - @ conf. rooms <br />ce <br />I <br />0.31 j <br />~ ~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.