Laserfiche WebLink
_. - --- ---- - __ _ _ . _ _ _ _ _ . _ ----_ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczoikowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate ~ _ _ Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />_ - --...____ _ <br />~ - - -- - - -- _ _ _ _ _ <br />Third Floor 28,279 <br />--- --- _ _ _- <br />Total Area 28,279 sf sf <br />-- - - -- _ <br />-- -- -- --- ___ <br />Third Floor Tenant Finishes Quantity Unit CosUUnit Cost Total Comments <br />WOOD & PLASTICS - Continued <br />Casework - Continued <br />support enforcement <br />base cabinet 4.0 If 165.00 660 <br />wall cabinet 4.0 If 85.00 340 <br />wait / reception <br />counter 9.0 If 275.00 2,475 <br />storage / workroom <br />base cabinet 42.5 If 165.00 7,013 <br />', wall cabinet 14.0 If 85.00 1,190 <br />I waiting ; <br />~ through-wall counter 7.0 If 75.00 525 <br />Subtotal 26,515 <br />. <br />TOTAL - WOOD & PLASTICS __ <br />_ - - <br />--- --- <br />- - - ------- <br />- - -- -- --329,343 <br />- - _ <br /> <br />MOISTURE - THERMAL CONTROL _ . ----- - --- -- <br />-___ --- - - -- <br />Firesafing <br />allowance 28,279 sf 0.02 500 500 0 <br />Subtotal 500 500 0 <br />Caulking & Sealants <br />caulking / sealants 28,279 sf 0.07 1,980 <br />_ -- ---- _. _ - - -- 1,980 0 <br />Subtotal 1,980 1,980 0 <br />TOTAL - MOISTURE - THERMAL CONTROL ~2,480 $2,480 ~ $0 <br />0.94 <br />1.04 <br />0.09 <br />Third Floor Tenant Improvements Detail Estimate - Page 2 <br />~ ~ ~ ~ f~ ~ ~ r ~ ~ ~ ~ _ ~ ~ ~ ~ ~ ~ <br />660 <br />340 <br />2,475 <br />7,013 <br />1,190 <br />525 <br />26,515 <br />29,343 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />