My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Design Development Construction Cost Estimate
>
CS_Courthouse Square
>
Design Development Construction Cost Estimate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:08:30 AM
Creation date
9/6/2011 10:32:45 AM
Metadata
Fields
Template:
Building
RecordID
10335
Title
Design Development Construction Cost Estimate
Company
Architectural Cost Constultants
BLDG Date
8/21/1998
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ w ~ ~ _ ~ ~ ~ <br />_ _ _ _. - - <br />- -_ _ - <br />ourthouse Square Al'ChlteCtUral COSt COaSUltBnts, LLC Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA I Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 ' Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, inc Portland, Oregon 97221 Print Time: 11:42 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 ___~ Construction Start: Spring 99 ~ <br />- ___- --- <br />_ _ _ -- <br />_ <br />_ _ --- <br />Ground Level <br />__ _ _ <br />County ~ <br />Transit 2,532 <br />6,572 <br />Conference Center 4,826 <br />Total Area _ -_ . _ ------ . _ . __. <br />13,930 st <br />FINISHES - Continued <br />Ceramic Tile <br />floor tile <br />type A <br />type E <br />conference center <br />base <br />type F <br />conference center <br />type G <br />wall tile <br />type F <br />conference center <br />Subtotal <br />Terrazzo <br />poured in place floor <br />Subtotal <br />Resilient <br />vct <br />transit <br />county <br />conference center <br />rubber base <br />transit <br />county <br />conference center <br />Subtotal <br />Jnit CosUUnit Cost Total <br />50 sf 9.25 463 <br />603 sf 9.75 5,879 <br />482 sf 9.75 4,700 <br />209 If 10.00 2,090 <br />189 If 10.00 1,890 <br />275 If 15.00 4,125 <br />768 sf 8.75 6,720 <br />596 sf 8.75 5,215 <br />2,538 sf 15.00 38,070 <br />1,010 sf 1.75 1,768 <br />459 sf 1.75 803 <br />40 sf 1.75 70 <br />880 If 1.50 1,320 <br />270 If 1.50 405 <br />322 If 1.50 483 <br /> 0 0 463 <br /> 0 5,879 p <br /> 0 0 4,700 <br /> 0 2,090 p <br /> 0 0 1,890 <br /> 0 4,125 p <br /> 0 6,720 0' <br /> 0 0 5,215 <br />31,081 0 18,814 12,267 <br /> 0 38,070 p <br />38,070 0 38,070 p <br /> 0 1, 768 p <br /> 803 0 p <br /> 0 0 7p <br /> 0 1,320 p <br /> 405 0 0 <br /> 0 0 483 <br />4,849 1,208 3,088 553 <br />Comments <br />Ground Level Tenant Improvements Detail Estimate - Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.