Laserfiche WebLink
_ - --- _ - - _ _ _ _ _ _ _ _ _ _ . _ _ -- <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 1120 AM <br />Design Development Probable Cost Estimate I Phone (503) 297-7210_ Fax (503) 297-7187 _ Construction Start: Spring 99 <br />_ _. _ _ _ <br />Streetscape Quantity Unit CosUUnit Cost Total ~ Comments <br />Canopies <br />east building elevation <br />west building elevation <br />south main entry <br />south building elevation <br />southwest pavilion (grid A13) <br />pavilion (grid A10) <br />clock tower <br />pavilion (grid A3) <br />northwest pavilion (grid A1) <br />Subtotal <br />Bridges <br />steel framing <br />metal decking <br />paint / finish exposed steel <br />soffit - paint exposed decking <br />gutters <br />Subtotal <br />Arcades / Pavilions / Clock Towers <br />precast concrete base <br />6" cmu backup <br />brick veneer <br />soldier course <br />steel framing <br />metal decking <br />membrane roofing <br />' metal panel <br />parapet coping <br />soffits / ceilings <br />roof trellis @ clock towers <br />; clock faces <br />~ paint exposed steel <br />~ Subtotal <br />!, TOTAL - SITE WORK <br />312 sf 55.00 17,160 <br />132 sf 55.00 7,260 <br />312 sf 75.00 23,400 <br />1,260 sf 55.00 69,300 <br />144 sf 55.00 7,920 <br />96 sf 55.00 5,280 <br />32 sf 55.00 1,760 <br />96 sf 55.00 5,280 <br />0 sf 55.00 0 <br /> _ _ _ __ __ <br />__ _ <br />13~ <br />9.7 ton 3,000.00 29,160 <br />2,900 sf 2.75 7,975 <br />3,268 If 3.50 11,438 <br />2,900 sf 1.00 2,900 <br />80 If 8.00 640 <br /> _ ___ <br />_ _ _ <br />5. <br />1,428 sf 40.00 57,120 <br />9,160 sf 8.50 77,861 <br />5,112 sf 18.25 93,294 <br />796 If 27.00 21,492 <br />10.2 tons 3,000.00 30,723 <br />2,156.0 sf 3.00 6,468 <br />2,156 sf 5.00 10,780 <br />2,090 sf 35.00 73,150 <br />560 If 18.00 10,080 <br />2,156 sf 8.00 17,248 <br />1,144 sf 35.00 40,040 <br />2 ea 10,000.00 20,000 <br />1 sum 3,000.00 3,000 <br /> 461 <br /> _ .___ - --. - <br />$1,377 <br /> 17,160 <br /> 7,260 <br /> 23,400' <br /> 69,300 ~ <br /> 7,920 <br /> 5,280 <br /> 1,760 <br /> 5,280 <br /> 0 <br />,360 0 0 137,360 <br /> 29,160 <br /> 7,975 <br /> 11,438 <br /> 2,900 <br /> 640 <br />,113 0 0 52,113 <br /> 57,120 <br /> 77,861 <br /> 93,294 <br /> 21,492 <br /> 30,723 <br /> 6,468 <br /> 10,780 <br /> 73,150 <br /> 10,080 <br /> 17,248 <br /> 40,040 <br /> 20,000 <br /> 3,000 <br />,256 0 <br />------ 0 461,256 <br />,937 $0. _ $0 $1,377,937 <br />NIC - future <br />~eriiy <br />allowance <br />Streetscape Detail Estimate - Page 4 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />