_ - --- _ - - _ _ _ _ _ _ _ _ _ _ . _ _ --
<br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 1120 AM
<br />Design Development Probable Cost Estimate I Phone (503) 297-7210_ Fax (503) 297-7187 _ Construction Start: Spring 99
<br />_ _. _ _ _
<br />Streetscape Quantity Unit CosUUnit Cost Total ~ Comments
<br />Canopies
<br />east building elevation
<br />west building elevation
<br />south main entry
<br />south building elevation
<br />southwest pavilion (grid A13)
<br />pavilion (grid A10)
<br />clock tower
<br />pavilion (grid A3)
<br />northwest pavilion (grid A1)
<br />Subtotal
<br />Bridges
<br />steel framing
<br />metal decking
<br />paint / finish exposed steel
<br />soffit - paint exposed decking
<br />gutters
<br />Subtotal
<br />Arcades / Pavilions / Clock Towers
<br />precast concrete base
<br />6" cmu backup
<br />brick veneer
<br />soldier course
<br />steel framing
<br />metal decking
<br />membrane roofing
<br />' metal panel
<br />parapet coping
<br />soffits / ceilings
<br />roof trellis @ clock towers
<br />; clock faces
<br />~ paint exposed steel
<br />~ Subtotal
<br />!, TOTAL - SITE WORK
<br />312 sf 55.00 17,160
<br />132 sf 55.00 7,260
<br />312 sf 75.00 23,400
<br />1,260 sf 55.00 69,300
<br />144 sf 55.00 7,920
<br />96 sf 55.00 5,280
<br />32 sf 55.00 1,760
<br />96 sf 55.00 5,280
<br />0 sf 55.00 0
<br /> _ _ _ __ __
<br />__ _
<br />13~
<br />9.7 ton 3,000.00 29,160
<br />2,900 sf 2.75 7,975
<br />3,268 If 3.50 11,438
<br />2,900 sf 1.00 2,900
<br />80 If 8.00 640
<br /> _ ___
<br />_ _ _
<br />5.
<br />1,428 sf 40.00 57,120
<br />9,160 sf 8.50 77,861
<br />5,112 sf 18.25 93,294
<br />796 If 27.00 21,492
<br />10.2 tons 3,000.00 30,723
<br />2,156.0 sf 3.00 6,468
<br />2,156 sf 5.00 10,780
<br />2,090 sf 35.00 73,150
<br />560 If 18.00 10,080
<br />2,156 sf 8.00 17,248
<br />1,144 sf 35.00 40,040
<br />2 ea 10,000.00 20,000
<br />1 sum 3,000.00 3,000
<br /> 461
<br /> _ .___ - --. -
<br />$1,377
<br /> 17,160
<br /> 7,260
<br /> 23,400'
<br /> 69,300 ~
<br /> 7,920
<br /> 5,280
<br /> 1,760
<br /> 5,280
<br /> 0
<br />,360 0 0 137,360
<br /> 29,160
<br /> 7,975
<br /> 11,438
<br /> 2,900
<br /> 640
<br />,113 0 0 52,113
<br /> 57,120
<br /> 77,861
<br /> 93,294
<br /> 21,492
<br /> 30,723
<br /> 6,468
<br /> 10,780
<br /> 73,150
<br /> 10,080
<br /> 17,248
<br /> 40,040
<br /> 20,000
<br /> 3,000
<br />,256 0
<br />------ 0 461,256
<br />,937 $0. _ $0 $1,377,937
<br />NIC - future
<br />~eriiy
<br />allowance
<br />Streetscape Detail Estimate - Page 4
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />
|