Laserfiche WebLink
~ ~ ~ ~ ~ <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />[Bus Mall _ <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <br />_ <br />_ _ __ _ _ _ - -- - - _ __ _ __ __ _ <br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />I Portland, Oregon 97221 Print Time: 1120 AM <br />~ Phone (503) 297-7210 Fax (503) 297-7187 Constniction Start: Spring 99 <br />_ - - - - -- <br />~ Quantity Unit CosUUnit Cost Total Comments <br /> <br />i <br />I - <br />; <br />Gates / Fences / Overhead Grilles <br /> securiry gate @ bridges (4 ea) <br /> lifting towers 8.1 ton 3,000.00 24,394 24,394 <br /> truss & pipe frame 12,765 Ibs 1.65 21,062 2~.062 <br /> mesh panel 3,404 sf 12.00 40,848 40,848 <br /> operating / lifting mechanism for above 4 ea 35,000.00 140,000 140,000 verify <br />~'~ security gates @ arcade entries ~ 1,080 sf 55.00 59,400 59,400 <br /> temp security fence @ nw crnr 42 If 15.00 630 630 <br />~ fence @ future development <br />tem 312 If 15.00 4,680 4,680 <br /> p <br />Subtotal _ - -- -- ___ -- <br />291,014 <br />0 <br />0 <br />291,014 <br /> Miscellaneous <br /> <br />' bus mall canopy ~ <br />columns ~ <br />26.9 ton 3,000.00 80,784 <br />80,784 <br />12" dia. x-strong pipe <br /> canopy framing 40.8 ton 3,000.00 122,472 122.4~2 <br /> misc bracing, cross bracing, cable, etc ~ 4.4 ton 2,500.00 11,010 11,010 <br /> I column tops 24.0 ea 350.00 8,400 8,400 <br /> gutters 614 If 12.00 7,368 ~.368 <br /> overhead glazing system 9,945 sf 27.30 271,499 271,499 price per Dea Mor <br /> paint exposed steel 4,184 If 3.50 14,644 14,~ <br /> 1'/;' rod 1,296 If 1.75 2,268 2,268 i <br /> pedestrian canopy ~ <br /> ' north arcade 1,440 sf 55.00 79,200 79,200 <br /> ' south building elevation 1,440 sf 55.00 79,200 79,200 <br /> north arcade <br />precast concrete base <br />896 sf 40.00 35,840 <br />3~.~~ <br /> 6" cmu backup 6,532 sf 8.50 55,522 55,522 <br /> brick veneer 4,276 sf 18.25 78,037 78,037 <br /> I soldiercourse 1,360 If 27.00 36,720 36,720 <br /> ~ steel framing ; 14.4 ton 3,000.00 43,146 43,146 <br /> parapet / top flashing / cap 1,384 sf 12.00 16,608 16,608 <br /> ' soffits/ceilings 1,384 sf 8.00 11,07 11,072 <br /> , <br />953 <br />789 0 0 953 <br />789 <br /> ! Subtotal , E , <br /> ~ TnTai - SITE WORK I 52,077,436 $0 _ _ _ _ $0 _ $2,077,436 <br />Bus Mall Detail Estimate - Page 3 <br />