Laserfiche WebLink
~ ~ ~ s _ w <br />Courthouse Square ~ <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc i <br />Design Development Probable Cost Estimate <br />Parking Level One <br />Gross Area <br />Parking ~ <br />ELECTRICAL , <br />~ basic materials & power distribution <br />lighting <br />100 watt hps 12" surface mtd <br />fire alarm ~ <br />snow melting @ ramp <br />Subtotal <br />-- - _ <br />TOTAL - ELECTRICAL <br />SUBTOTAL _ ~ <br />GENERAL CONDITIONS <br />GENERAL CONTRACTOR FEE <br />ESTIMATING CONTINGENCY <br />I INDEX TO CONSTRUCTION START <br />TOTAL DIRECT CONSTRUCTION COST <br />Parkin~ <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ A ~ ~ <br />__ _ <br />__ _ _ <br />_ _ _ <br />__ <br />Architectural Cost Consultants, LLC Estimate Date: R21-Aug-98 <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />PoRland, Oregon 97221 Print Time: 11:20 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 _ <br />. _ ----- -- - _ --- - - <br />70,793 <br />- . _ ___ __ <br />_ _- - <br />70,793 sf <br />- ---- --- -- <br />_ _ - - ___ -- _- --- - _ , <br />Quantity Unit CosUUnit Cost Total Comments <br />_____ - __ -- -~~~ I <br />70,793 sf 0.75 53,095 53,095 <br />70 fixt 435.00 30,450 <br />70,793 sf 0.40 28,317 <br />2,254 sf 18.00 40,572 <br />-- ----- <br />152,434 <br />__ _ _ <br />- ___ _ _ -- <br />~152,434 <br />- -- - - -- <br />2,566,338 52,566,338 <br />7.75°~ 198,891 <br />3.75% 103,696 <br />4.50% 129,102 <br />Spring 99 0.75% 22,485 b454,174 <br />70,793 sf 542.67 /sf _ _ 53,020,512 <br />0 <br />30,450 <br />28,317 <br />0 0 152,434 <br />0 $0 $152,434 2.15 <br />399,374 399,374 1,767,590 $2,566,338 _ <br />30,951 30,951 136,988 <br />16,137 16,137 71,422 <br />20,091 20,091 88,920 <br />3,499 3,499 15,487 @ t 3% per year <br />$470 <br />$3,020,512 _ <br />Parking Detail Estimate - Page 11 <br />