Laserfiche WebLink
Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckle Costic Architects, Inc <br />Design Development Probable Cost Estimate <br />Ground Level <br />Second Floor <br />Third Floor <br />Fourth Floor <br />Fifth Floor <br />Penthouse <br />Total Gross Area <br />Buildin~ Shell 8 Core <br />_ _ _ -____ _ -- . ___ <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503) 297-7210 Fax (503) 297-7187 <br />_ _ - _ ___ --- <br />23,249 <br />32,088 <br />32.088 <br />32,088 <br />32,012 <br />1,818 <br />153,34 <br />_ _ ___ _ _ <br />- - - - -- <br />Quantit~ Unit CosUUnit Cost Total _ <br />ELECTRICAL - Continued <br />Grounding Systems <br />grounding rods 3 ea <br />ground rods wiring 50 If <br />Emergency Light & Power <br />panels 7 ea <br />Emergency Generator <br />45.00 135 <br />20.00 1,000 <br />3,600.00 25,200 <br />25 KVA w/ ATS 1 sum 30,000.00 30,000 <br />Controls <br />lighting control <br />1 sum <br />8,000.00 <br />8,000 <br />Basic materials, methods & fees 153,343 sf 0.49 75,000 <br />Subtotal <br />i <br /> <br />TOTAL - ELECTRICAL __ __ _ <br />_ ___ __ __ <br />__ <br /> <br />SUBTOTAL - <br /> <br />- - --- <br />9 569,373 59,569,373 <br />-- -- <br />I GENERAL CONDITIONS i 7.75% 741 626 <br />' GENERAL CONTRACTOR OH & FEE I <br />~ 3.75% 386,662 <br />' <br />~ ESTIMATING CONTINGENCY <br />I 4.50% 481,395 <br />I <br />INDEX TO CONSTRUCTION START <br />~ <br />~ Spring 99 <br /> <br />- 0.75% 83,843 51,693,527 <br />_ _ _ - -- - -- <br />- <br />TOTAL DIRECT CONSTRUCTION COST I - <br />, <br />j Buildin~ Shell 8 Core ; 153,343 sf $73.45 /sf a11,262,900 <br />22,943 22,943 0 0 <br />1,778 1,778 0 0 <br />927 927 0 0 <br />1.154 1.154 0 0 <br />20~ 20~ o 0 <br />a2~ <br />So <br />_ _--__-- _ - <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />6.86 <br />._ <br />738,070 <br />384,808 <br />479,086 <br />s3,4a~ @ t 3% per year <br />i,208,8sa $11,262,900 <br />Building Shell & Core Detail Estimate - Page 20 <br />~ ~ ~ ~ ~ ~ ~ r ~ ~ r ~ ~ ~ ~ ~ ~ ~ <br />Comments _ __ <br />