|
Courthouse Square Architectural Cost Consultants, LLC
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />Salem, Oregon I 6441 SW Canyon Court, Suite 103
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221
<br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187
<br />
<br />Ground Level _ _-__ __ __ _ _ _
<br />23,249
<br />Second Floor 32,088
<br />Third Floor 32,088
<br />Fourth Floor 32,088
<br />Fifth Floor 32,012
<br />i Penthouse 1,878
<br />Total Gross Area -
<br />153,34
<br />_
<br />Building Shell ~ Core _ _ -- ------ -- - --- -
<br />Quantity Unit CosUUnit Cost Total
<br />~ MECHANICAL - _ _ _ _ -- _ - --
<br />HVAC
<br />basic materials & methods 153,343 sf 1.00
<br />boiler & heating water system
<br /> sf 0.00
<br />central air handling & fan system
<br />ac-1 & 2- 90 ton 180 ton 1,075.00
<br />ac-3 - 130 ton ~ 130 ton 970.00
<br />ac-4 - 25 ton I 25 ton 1,200.00
<br />air distribution
<br />mp ductwork & insulation
<br />slot diffusers
<br />square diffusers
<br />return air grilles
<br />terminal & package units
<br />VAV FP terminal unit, elect reheat
<br />TU
<br />controls
<br />128,150 cfm
<br />27 ea
<br />89 ea
<br />29 ea
<br />45 ea
<br />115 ea
<br />153,343 sf
<br />3.00
<br />300.00
<br />200.00
<br />100.00
<br />1,200.00
<br />1,000.00
<br />1.25
<br />balancing
<br />remainder undefined
<br />Subtotal
<br />~ 153,343 sf
<br />I 153,343 sf
<br />0.50
<br />1.25
<br />__ _ _ .
<br />Comments
<br />153, 343 153,343
<br /> 0
<br />0
<br />193,500 ~s3,5oo
<br />126,100 ~ yg, ~ pp
<br />30,000 30,000
<br />384,450 384,450
<br />8,100 8.100
<br />17,800 ~ ~,gpp
<br />2,900 2,900
<br />54,000 5a,00o
<br />115,000 1 t 5,000
<br />0
<br />191,678 191,678
<br />0
<br />0
<br />76,671 76,671
<br />0
<br />191,678 191.678
<br />1,545,220 0 0 0 0 ~,545,220
<br />10.08
<br />Building Shell & Core Detail Estimate - Page 16
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~
<br />Estimate Date: R21-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />Construction Start: Spring 99
<br />
|