Laserfiche WebLink
Courthouse Square Architectural Cost Consultants, LLC <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />Salem, Oregon I 6441 SW Canyon Court, Suite 103 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 <br /> <br />Ground Level _ _-__ __ __ _ _ _ <br />23,249 <br />Second Floor 32,088 <br />Third Floor 32,088 <br />Fourth Floor 32,088 <br />Fifth Floor 32,012 <br />i Penthouse 1,878 <br />Total Gross Area - <br />153,34 <br />_ <br />Building Shell ~ Core _ _ -- ------ -- - --- - <br />Quantity Unit CosUUnit Cost Total <br />~ MECHANICAL - _ _ _ _ -- _ - -- <br />HVAC <br />basic materials & methods 153,343 sf 1.00 <br />boiler & heating water system <br /> sf 0.00 <br />central air handling & fan system <br />ac-1 & 2- 90 ton 180 ton 1,075.00 <br />ac-3 - 130 ton ~ 130 ton 970.00 <br />ac-4 - 25 ton I 25 ton 1,200.00 <br />air distribution <br />mp ductwork & insulation <br />slot diffusers <br />square diffusers <br />return air grilles <br />terminal & package units <br />VAV FP terminal unit, elect reheat <br />TU <br />controls <br />128,150 cfm <br />27 ea <br />89 ea <br />29 ea <br />45 ea <br />115 ea <br />153,343 sf <br />3.00 <br />300.00 <br />200.00 <br />100.00 <br />1,200.00 <br />1,000.00 <br />1.25 <br />balancing <br />remainder undefined <br />Subtotal <br />~ 153,343 sf <br />I 153,343 sf <br />0.50 <br />1.25 <br />__ _ _ . <br />Comments <br />153, 343 153,343 <br /> 0 <br />0 <br />193,500 ~s3,5oo <br />126,100 ~ yg, ~ pp <br />30,000 30,000 <br />384,450 384,450 <br />8,100 8.100 <br />17,800 ~ ~,gpp <br />2,900 2,900 <br />54,000 5a,00o <br />115,000 1 t 5,000 <br />0 <br />191,678 191,678 <br />0 <br />0 <br />76,671 76,671 <br />0 <br />191,678 191.678 <br />1,545,220 0 0 0 0 ~,545,220 <br />10.08 <br />Building Shell & Core Detail Estimate - Page 16 <br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r ~ <br />Estimate Date: R21-Aug-98 <br />Document Date: 23-Ju1-98 <br />Print Date: 21-Aug-98 <br />Print Time: 11:20 AM <br />Construction Start: Spring 99 <br />