Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Ground Level
<br />Second Floor
<br />Third Floor
<br />Fourth Floor
<br />' Fifth Floor
<br />Penthouse
<br />Total Gross Area
<br />Buildin~ Shell 8 Core
<br />_ -- .
<br />Architectural Cost Consultants, LLC
<br />James A. Jerde, AIA - Staniey J. Pszczolkowski, AIA
<br />6441 SW Canyon Court, Suite 103
<br />Portland, Oregon 97221
<br />Phone (503)297-7210 Fax (503)297-7187
<br />_
<br />---_--
<br />__ __
<br />23,249
<br />32,086
<br />32, 088
<br />32,088
<br />32,012
<br />1,818
<br />. 153,34:
<br />__ __ - - - __ - -
<br />Quantity Unit CosUUnit Cost Total
<br />METALS - Continued
<br />Miscellaneous metals
<br />railings
<br />i stair center guardrail 311 If 50.00 15,550
<br />wall rail 528 If 28.00 14,784
<br />above bay windows (see elevations) 96 If 80.00 7,680
<br />balcony rail - top wall mtd @ lobby 19 If 45.00 855
<br />pit ladder 21.0 If 65.00 1,365
<br />perimeter wall ledger, support & kickers 4,060.0 If 30.00 121,800
<br />miscellaneous (embeds, angle, plate, etc 153,343 sf 0.25 38,336
<br />i Subtotal
<br />~
<br />I - --- -
<br />200,370
<br />~ TOTAL - METALS
<br />__ _ -- _ _ _. _ 5277,624
<br />I ---- _ .__
<br />
<br />WOOD & PLASTICS _ _ _ __
<br />
<br />
<br />_ ---
<br />--
<br />
<br />-
<br />-- - - ---
<br />
<br />_
<br />-- -- ---
<br />
<br />_ - --
<br />j Rough carpentry ~
<br />miscellaneous blocking & backing ~ 153,343 sf 0.35 53,670
<br />~ parapet backing 2,842 sf 1.85 5,258
<br />
<br />Subtotal
<br />I ----_ -- ---
<br />58,928
<br />'i Finish carpentry ;
<br />' chair rails @ corridors I 1,497 If 8.00 11,976
<br />I wood cap @ 2nd flr balcony wall i 19 If 15.00 285
<br />i Subtotal i - - - -12,261
<br />Casework
<br />restrooms (2nd, 3rd, 4th 8 5th flrs)
<br />0 0 0 0
<br />ao - so ao ao
<br />ao so ao ao
<br />Estimate Date: R21-Aug-98
<br />Document Date: 23-Ju1-98
<br />Print Date: 21-Aug-98
<br />Print Time: 11:20 AM
<br />Construction Start: Spring 99
<br />15,550
<br />14,784
<br />7,B90
<br />855
<br />1,365
<br />121,800
<br />38,338
<br />200,370
<br />_- - _ _
<br />_ Comments
<br />3277.624 1.81
<br />- -- _ __ I
<br />53,670 incls roof blocking I
<br />5,258 ~
<br />558,928
<br />I 11,976
<br />285
<br />so ao ao so s,2,ss,
<br />plam lav counter 64.0 If 95.00 6,080 6,080
<br />janitors closet (2nd, 3rd, 4th & 5th flrs)
<br />shelving 54.0 If 84.00 4,536 a,536
<br />---- -_____ _.__
<br />ubtotal 10,616 $o go $o So 5~0,616 0.07
<br />~_
<br />_ - -
<br />TOTAL - WOOD 8 PLASTICS ~81,805 ~o ~0 3o ao _ a87,8o5 0.53
<br />Building Shell 8 Core Detail Estimate - Page 6
<br />~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
<br />
|