My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Pence Kelley
>
CS_Courthouse Square
>
Financial- Pence Kelley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 3:48:12 PM
Creation date
9/1/2011 4:20:32 PM
Metadata
Fields
Template:
Building
RecordID
10216
Title
Financial- Pence Kelley
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
altemates. The cost of the original fee was split 72% / 28%. The fee for the current design is <br />shazed at 69.36% / 30.64%. <br />Reimbursables - Estimated cost of design-related reimbursable e~enses (shared 69.36%/ <br />30.64%). <br />Preliminary Bus Mall Planning - Actual cost of the preliminary transit ma11 design (Transit only <br />expense). ~ <br />Value Engineering - Actual cost of value engineering session with Meng & Associates (Transit <br />only expense). <br />Project Estimating, Other Consultants - Estimated cost of subconsultants not included in the <br />architectural contract. Such consultants include project estimating, elevator consultants, and <br />acoustical consultant (shazed 69.36% / 30.64%). . . <br />Building Commissionin~ - Estimated cost of commissioning net of Oregon Office of Energy <br />graut (shazed 79.93% / 20.07%). <br />Building Testing and Balancing - Estimated cost of testing and balancing services (shared <br />79.93% / 20.07%). <br />PROJECT MANAGEMENT AND CONSTRUCTION SERVICES <br />Melvin Mazk Development Co. - Preconstruction Services - Actual cost of M11~IDC services <br />through design #2 preconstruction (County only expense). <br />M11~IDC Construction Mana.gement - Contract amount for r~IlVIDC during construction phase <br />(shared 69.36% / 30.64%). Assumes an additional three months estimated fee to generally <br />correspond with substantial completion. This additional fee is currently a County only e~ense. <br />1VIlVIDC reimburseables - Contract amount for NIl~~IDC reimbursables during construction phase <br />(shated 69.36% / 30.64%). <br />Pence Kelly - Original / Revised Design Cost for Estimating and Va1ue Engineering Services - <br />Actual cost of Pence Kelly's services during the preconstructioa phase. Costs were <br />incuned when construction contract was to be negotiated rather than bid (original costs <br />shazed 72% / 28%; revised costs shared 69.36% / 30.64%). <br />D. Berry - Actual amount paid to D. Beney (shared 72% / 28%). <br />LOAN FEES AND FINANCIAL COST5 <br />Appraisal- Estimated cost of real estate appraisal and title services (County only expense). <br />Property Taxes during Construction - Assumes County and Transit space will be exempt from <br />properiy taxes during constxuction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.