Laserfiche WebLink
znouse square <br />8 Hiph Street <br />~ <br />Is Castie Archkscts, Inc <br />Dswlopmsnt Probabb Cost <br />Architectural Coat Conaultanta, LLC <br /> <br />James A. Jerds, AIA - Stsnby J. PuczoAcowski <br />AW ea~m.~s on•: rt2t.~uq-ee <br />. <br />8441 SW Canya~ Court, Suks 703 p~~ ~: Z~~~ <br /> <br />Portland, Orsppn 97Y21 Print Date: 21-Aup-9B <br /> <br />Phons (503) 2g7-7210 Fax (503) 297-7187 Print Time: 17:20 AM <br />_ ConsMkNon Start Sorina 99 <br />~ DIRECT CONSTRUCTION COST - PARTNERS SUMMARY <br />Component <br />Building Shell 8 Core <br />Paricinp <br />Bus Malt <br />Street Scape <br />Tenant Finishes <br />County <br />Transit <br />Solid Waste <br />Conteronca Center <br />TOTAL DIRECT ON <br />Cost / sf <br />Butlding Shell 8 Core <br />Parking <br />s~. M.o <br />Street 3cape <br />County <br />Transk <br />Solid Waste <br />Conference Center <br /> Area Bldg 3~ C Conferenca Ctr. County Solid Waste Transit Park(ng Bus Malt 3treetscape Totala Comments <br /> <br /> 153,343 af <br />70,793 ai <br />68,528 sf <br />33,720 sf 11,208,894 <br />0 <br />0 <br />0 0 <br />0 <br />0 <br />0 27,003 <br />470,053 <br />0 <br />0 0 <br />0 <br />0 <br />0 27,003 <br />470,053 <br />0 <br />0 , 0 <br />2,080,407 <br />0 <br />0 0 <br />0 <br />2,503,582 <br />0 0 <br />0 <br />0 <br />1,691,150 511,262,900 <br />53,020,512 <br />52,503,582 <br />51,691,150 <br />86~642 gf 0 0 1,860,084 0 ~ 0 0 0 0 s1,860,084 <br />17,490 sf 0 0 0 0 677,889 0 0 0 5677 <br />889 <br />5,932 sf 0 0 0 156,097 0 0 0 0 , <br />:756 <br />097 <br />4,826 sf 0 248,909 0 0 0 0 0 0 , <br />5248,809 <br />11~2U8~894 248,909 2,357,139 156,097 1,174,945 2,080,407 2,503,582 1,691,150 <br />573 <br />10 21,421,123 <br />. <br />551.58 527.21 a26.31 567.18 $29.39 $37.63 a50.15 <br />511.208,894 <br />s2,oso,~o~ <br />52,503,682 <br />51,691,150 <br />52.357,139 <br />i1,174,945 <br />5156,097 <br />_ 5248.809 <br />i21,421,123 <br />ALItKIYATES <br />1 Parkin <br />Altemat <br />1 Bld 3~ C Conference CV. Coun Solid Waste Transit Parkin Bus Mall Streetsca Totals <br />g <br />e <br />23,278 sf <br />2 Parking Altemate 2 19 <br />467 sf 0 <br />0 0 61,845 0 61,645 807,058 0 0 5930,347 <br />, <br />3 0 0 0 0 0 808,522 0 0 5808,322 <br />sf <br />4 0 gf <br />0 <br /> 0 <br />The above estimates are for direct construction cost only. They do not indude fumishings ~ equipment, consultant fees, inspection and testing fees, plan check fees, hazardous material testing and <br />removal, flnancing costa, nor any other nortnally aaaociated development costs. <br />Tha abova estimatea assume a competitivety bid project, with at leaat three qualified biddera in each of the major sub-trades as well as the general contractors. AII work to be contracted at one time <br />(shell ~ oore, street 8 bus mall and tenant improvements). If project is to be phaaed, additional oost aasocfated with phasing to be added. <br />The above eatimatea sasume a constniction start date of: Spring 99 If the start of conatrudion ia delayed beyond this date, the estimetea muat be indexed at a rate of 3- 5% per year compounded. <br />Partner Summary <br />• • ~ <br />