<br />Dswlopmsnt Probabb Cost
<br />Architectural Coat Conaultanta, LLC
<br />
<br />James A. Jerds, AIA - Stsnby J. PuczoAcowski
<br />AW ea~m.~s on•: rt2t.~uq-ee
<br />.
<br />8441 SW Canya~ Court, Suks 703 p~~ ~: Z~~~
<br />
<br />Portland, Orsppn 97Y21 Print Date: 21-Aup-9B
<br />
<br />Phons (503) 2g7-7210 Fax (503) 297-7187 Print Time: 17:20 AM
<br />_ ConsMkNon Start Sorina 99
<br />~ DIRECT CONSTRUCTION COST - PARTNERS SUMMARY
<br />Component
<br />Building Shell 8 Core
<br />Paricinp
<br />Bus Malt
<br />Street Scape
<br />Tenant Finishes
<br />County
<br />Transit
<br />Solid Waste
<br />Conteronca Center
<br />TOTAL DIRECT ON
<br />Cost / sf
<br />Butlding Shell 8 Core
<br />Parking
<br />s~. M.o
<br />Street 3cape
<br />County
<br />Transk
<br />Solid Waste
<br />Conference Center
<br /> Area Bldg 3~ C Conferenca Ctr. County Solid Waste Transit Park(ng Bus Malt 3treetscape Totala Comments
<br />
<br /> 153,343 af
<br />70,793 ai
<br />68,528 sf
<br />33,720 sf 11,208,894
<br />0
<br />0
<br />0 0
<br />0
<br />0
<br />0 27,003
<br />470,053
<br />0
<br />0 0
<br />0
<br />0
<br />0 27,003
<br />470,053
<br />0
<br />0 , 0
<br />2,080,407
<br />0
<br />0 0
<br />0
<br />2,503,582
<br />0 0
<br />0
<br />0
<br />1,691,150 511,262,900
<br />53,020,512
<br />52,503,582
<br />51,691,150
<br />86~642 gf 0 0 1,860,084 0 ~ 0 0 0 0 s1,860,084
<br />17,490 sf 0 0 0 0 677,889 0 0 0 5677
<br />889
<br />5,932 sf 0 0 0 156,097 0 0 0 0 ,
<br />:756
<br />097
<br />4,826 sf 0 248,909 0 0 0 0 0 0 ,
<br />5248,809
<br />11~2U8~894 248,909 2,357,139 156,097 1,174,945 2,080,407 2,503,582 1,691,150
<br />573
<br />10 21,421,123
<br />.
<br />551.58 527.21 a26.31 567.18 $29.39 $37.63 a50.15
<br />511.208,894
<br />s2,oso,~o~
<br />52,503,682
<br />51,691,150
<br />52.357,139
<br />i1,174,945
<br />5156,097
<br />_ 5248.809
<br />i21,421,123
<br />ALItKIYATES
<br />1 Parkin
<br />Altemat
<br />1 Bld 3~ C Conference CV. Coun Solid Waste Transit Parkin Bus Mall Streetsca Totals
<br />g
<br />e
<br />23,278 sf
<br />2 Parking Altemate 2 19
<br />467 sf 0
<br />0 0 61,845 0 61,645 807,058 0 0 5930,347
<br />,
<br />3 0 0 0 0 0 808,522 0 0 5808,322
<br />sf
<br />4 0 gf
<br />0
<br /> 0
<br />The above estimates are for direct construction cost only. They do not indude fumishings ~ equipment, consultant fees, inspection and testing fees, plan check fees, hazardous material testing and
<br />removal, flnancing costa, nor any other nortnally aaaociated development costs.
<br />Tha abova estimatea assume a competitivety bid project, with at leaat three qualified biddera in each of the major sub-trades as well as the general contractors. AII work to be contracted at one time
<br />(shell ~ oore, street 8 bus mall and tenant improvements). If project is to be phaaed, additional oost aasocfated with phasing to be added.
<br />The above eatimatea sasume a constniction start date of: Spring 99 If the start of conatrudion ia delayed beyond this date, the estimetea muat be indexed at a rate of 3- 5% per year compounded.
<br />Partner Summary