My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- COPS (Official Statement/Drafts)
>
CS_Courthouse Square
>
Financial- COPS (Official Statement/Drafts)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:27:01 PM
Creation date
8/23/2011 11:17:08 AM
Metadata
Fields
Template:
Building
RecordID
10161
Title
Financial- COPS (Official Statement/Drafts)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~ ~ <br />~ for use of the funds. The same cannot be said for any alternatives to the Courthouse Square <br />project. <br />• There is an outstanding investment to date in the Courthouse Square project of <br />approximately $6 million. Land costs, demolitioq environmental mitigatioq and <br />architectureJengineering expenses could not be fully recovered through sale of the property <br />on the open market. It is conservatively estimated that the governing bodies would lose $3 <br />million in value.should the project be discontinue3. <br />• The land for the county and transit facilities is already under public ownership. While <br />selling the land recoups a portion of the investment, it does nothing to meet the needs for a <br />downtown transit facility and consolidated county office spaces. Those needs remain <br />unmet, and will require expenditures once again for land and site preparation. <br />• The Courthouse Square project as desigued meets virtually all of the criteria mentioned ss <br />comprising an efficiently designed transit center (on pages 3 and 4). The design is compact <br />and off-street...weather protection covers the entire waiting and pedestrian areas...the <br />design fully me~ts ADA standards... the facility is well lit, separated from trafiic, and has <br />safe and convenient pedestrian access to the surrounding block. .. customer services are an <br />integral part of the facility. .. the "sawtooth" bus bay design provides for independent bus <br />access and egress... access to the downtown and State mall is optimized at the Senator <br />block location... and, the streets which access the facility have lower traffic volumes than <br />most other downtown arterials. <br />Beyond these points, there are other reasons why the Courthouse Square project has received <br />the formal support of a variety of downtown concerns. It seems to make good sense to those <br />who have led this project to combine a major employment center of several hundred employees <br />with a public, transit facility. Some of those employees are currently involved in transit - <br />incentive programs, aad it would seem that many more could be attracted just on the strengt~ <br />of the proximal relationslup between transit services and their workplace. <br />Additionally, the close physical proximity of an employee ~base provides an extra measure of <br />security for the transit mall itself. The presence of three hundred employees in an adjoining <br />building creates an environment of "eyes on the street," and stands to greatly benefit mall <br />security. <br />Finally, the Courthouse Square project still retains a private component. A 17,000 sq. foot pad <br />is available on the Chemeketa Street frontage of the block, a footprint which could result in <br />several floors of retail and/or commercial development. The proceeds of a land lease or sale of <br />the property accrue to the District and County as owners, and help reduce the public cost of <br />operating the Courthouse Square facility. While the public perception may be that this project <br />has lost its private partnership, the reality is much different. <br />IN CONCLUSION... <br />~ Certainly not all of the answers to all of the questions are clear-cut and easily confirmed. <br />Courthouse Square is a complex undertaking. Like the project itself, some questions require a <br />g <br />
The URL can be used to link to this page
Your browser does not support the video tag.