My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- COPS (Official Statement/Drafts)
>
CS_Courthouse Square
>
Financial- COPS (Official Statement/Drafts)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:27:01 PM
Creation date
8/23/2011 11:17:08 AM
Metadata
Fields
Template:
Building
RecordID
10161
Title
Financial- COPS (Official Statement/Drafts)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the county at the <br />recommendation of ISMT. <br />Recommendation: Forward this <br />issue to ISMT for further <br />review and budget analysis. <br />6 <br />7 <br />8. <br />9 <br />Special Data <br />Connections PE $? This item reflects the cost of <br />extending new conduit under <br />Court Street for ph/data <br />connections between the <br />Courthouse and Ch2. Bob <br />McCune will work with the <br />architect to obtain cost <br />estimates. <br />Automated <br />filing Syste DE $? Four departments have <br />expressed interest in <br />automated space savor type <br />filing systems. Richard <br />Strickland is working with <br />vendors to define equipment <br />options, cost estimates and <br />procurement procedures. <br />Electrical <br />Connections PE/FB/DE $? Floor plans are being refined <br />to identify all necessary <br />electrical connections for <br />office equipment and modular <br />office units. Normally, the <br />final connections to office <br />furnishing is a department <br />expense. The work will be <br />performed by facilities staff. <br />(policy issue) Should this <br />expense be added to the <br />project allowance or budgeted <br />as a facility or department <br />expense? <br />Transformer N/A $ 0 The location of the <br />transformer has tentatively <br />been resolved with PGE. The <br />in-ground location on the east <br />side of the building does not <br />appear to have any additional <br />costs to the project. <br />Signage PE - At this time, it appears the <br />allowance in the budget is <br />adequate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.