Laserfiche WebLink
altemates. The cost of the original fee was split 72% / 28%. The fee for the current design is <br />shazed at 69.36% / 30.64%. <br />Reimbursables - Estunated cost of design-related reimbursable expenses (shazed 69.36%/ <br />30.64%). <br />Preliminary Bus Mall Planning - Actual cost ofthe prelimiuary transit mall design (Transit only <br />expense). ' <br />Value Engineering - Actual cost of value engineering session with Meng & Associates (Transit <br />only expense). <br />Project Estimating, Other Consultants - Estimated cost of subconsultants not included in the <br />architectural contract. Such consultants include project estimating, elevator consultants, and ~ <br />acoustical consultant (shared 69.36% / 30.64%). <br />Building Commissioning - Estimated cost of commissioning net of Oregon Office of Energy <br />grant (shared 79.93 % / 20.07%). <br />Building Testing and Balancing - Estimated cost of testiug and balancing services (shazed <br />79.93% / 20.07%l. <br />PROJECT MANAGEMENT AND CONSTRUCTION SERVICES <br />Melvin Mazk Development Co. - Preconstmction Services - Actual cost of M1vIDC services <br />through design #2 preconstruction (Counry only expense). <br />MR~IDC Construction Management - Contract amount for MIVIDC during construction phase <br />(shazed 6936% / 30.64°/a). Assumes an additional three months estimated fee to generally <br />correspond with substantial completion. This additional fee is currently a County only e~ense. <br />MIlvIDC reimburseables - Contract amount for MIvIDC reimbursables during constsuction phase <br />(shared 69.36% / 30.64%). <br />Pence Kelly - Original / Revised Design Cost for L~stimating and Value Engineering Services - <br />Actual cost of Pence Kelly's services during the preconstruction phase. Costs were <br />incurred when construction contract was to be negotiated rather than bid (original costs <br />shared 72% / 28%; revised costs shared 69.36% / 30.64%). <br />D. Berry - Actual amount paid to D. Berrey (shared 72% / 28%). <br />LOAN FEES AND FINANCIAL COSTS <br />Appraisal - Estimated cost of real estate appraisal and title services (County only expense). <br />Properiy Ta~ces during Construction - Assumes County and Transit space will be exempt from <br />property taxes during construction. <br />