My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Financial- Budget (1- 2 Files)
>
CS_Courthouse Square
>
Financial- Budget (1- 2 Files)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 2:18:32 PM
Creation date
8/19/2011 3:29:53 PM
Metadata
Fields
Template:
Building
RecordID
10149
Title
Financial- Budget (1- 2 Files)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Finance
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o • <br />From: DAVID HARTVVIG <br />To: BWasson <br />Date: 12/10/97 5:12pm <br />Subject: Senator Sewer Llne <br />I walked the site this moming with FOSS and Century West staff and reviewed the area where the sewage spillage <br />occurred. In talking with them, I determined that the issue is not another sewer line, but sewer stubs which run into <br />the main. <br />Normally, stubs are capped during demolition. Stayton Construction was to cap the stub lines to prevent spillage. <br />They did not do this because at the time it was believed that construction excavation would begin soon after <br />demolition and that the sewer main along the alley would have to be abandoned/replaced. 1 was not aware of this <br />decision and do not remember that the issue was ever discussed with me o~ the representative from Century West. <br />t talked to Tim Daley with the city this aftemoon. He says that he discussed this issue with Stayton Const. at the <br />beginning of demolition. Mike Stayton told Tim that further excavation would oocur after demolition and that it <br />would not be necessary to cap the stubs. Tim seems to remember that he told Mike that it would have to be done. <br />Stayton Const. completed the demo work and left town before Tim got back to the site. <br />Tim is concemed that future spillage will occur and he will have a problem with DEQ. I am sure we would have a <br />problem as well. He is sending me maps which he believes will help us locate the known stub lines and copies of <br />the five permits Stayton Const. took out related to these stub lines. <br />I will seek to get a general idea of the location of the lines with the help of FOSS and Century West. I intend to <br />contact Stayton Const. and have them come up and cap the stub lines that we have knowledge of their location. <br />When I talked with Mike Stayton he indicated that they would do this work as part of their original agreement. <br />ALSO, during the moming's walk, I discussed the contour work that needs to be done. It appears that in two cases <br />the hole will basically be covered up if slopping is done to standard. On the Chevron comer, the sbpping will <br />deposit soil as well. This is a potential problem regarding excavation and compaction work for construction. <br />There may be a need to pump water out of two of the holes to do this work. The water will be treated as is <br />currently being done prior to release into the storm drains. To give you an idea as to how much water, there is ~ <br />40,000 gals. in the Chevron comer. <br />Century West has plots of each excavation site and the depth. These could be used by Pence/Kelly as a guide for <br />the preparation for constn~cti~n. It would appear that Pence/Kely will have to carefuly determine the soil <br />composition of the whole area as they excavate any way, so this would not appear to be a bg issue. I have asked <br />Tom Gainer, Century West, to talk to Dave Hayes at Pence/Kelly for input. <br />I will keep you infoRned as to the issues above. If you want more information, or if you have additional knowledge <br />of these issues, please let me know. The beat gces on ............... <br />I will keep you informed. <br />CC: MHansen,RCurtis <br />
The URL can be used to link to this page
Your browser does not support the video tag.