Laserfiche WebLink
FEE SCHUDULE ~ ENVIRONMENTAUENGINEERIN~ .~ RElATEC1 SERVICES <br />EJCHIBfT "A•' <br />EF'~EGTIVE FEBi~UARY 27, 19$5 <br />This schedule subJe~t to chan~e <br />Tho compensation for work done on ih~ basis of technicaf and professional services plu5 incurred <br />expenses will be establfshed using the rates es set forth below: <br />A. TECHNICAL AND PROFESSIONAL SERViCES <br />Principal ~ <br />Program Manager <br />EngineerlScientist 7 <br />Enginaer/Sctentist 5-6 <br />EngineerlSaentist 3-4 <br />EngineerlScientist 1-2; Senior 7'echrtlcian; Seniar CAD Operatar <br />TechnicaNCAO Oparator <br />Project Assistar~t <br />B, TRAVEL AND SUBSlSTENCE <br />Markup appti~d to travef and subsisfanca is ~ssessed at a flat rate of 15%. <br />C. OUTSlDE EXP~NSES <br />125.OQ <br />1 Q5.00 <br />88.00 <br />72.00 <br />6iJ.00 <br />50.00 <br />45.00 <br />ao.ao <br />Any outside expenses (includin~ subconsulkgnt gnd subcontrador services) incurred for this <br />project by Century West Engineering will be charged at the actuat cost of the expense ptus 15%. <br />D. IN-HOUSE EXPENSE~ <br />Eauipment ~cpenses: <br />Combustible Gas Meter <br />Celiular Telephone <br />Organic Vapor Detector <br />Hand Auger <br />Vehicle Mifea~e <br />Soil Gas Probe <br />Protecliv~, Equip. <br />5am~ling Pump <br />Data Logger <br />Photvcopy <br />Fax Machine <br />$ 50.OOldsy <br />15,OO/day <br />50.OQ/dey <br />50.001day <br />~ .60/mile <br />50.00/day <br />20.DO/day <br />~O.OO/day (150.OOlwk max,) <br />100.00/day <br />.10/copy <br />1.OO/page <br />Laboratarv ~t~ensesi. <br />Tests, equtpment, suppites, snd servtces provided by century WesYs in-house laboratories wili be <br />charg~d at the labaratory prir.es current at the time these ~cp~nses are incurred. <br />-nsurance Certificat~ far Nam~d I~sureds: ~ 104.OO/year <br />02/22/95 <br />H lsharelportl~nd~ttib.anv <br />