Laserfiche WebLink
• <br />~ <br />• <br />Marion County Courthouse Square osit3~8 <br />ES'I'IIvIpTED DEVELOPMENT COSTS 2:40 PM <br />THIS BUDGET EXCLUDES ALL STREETSGPE COSTS <br />Four Story Design -258 Subsurfxce Parking Stalls <br />Assumes Exempt Bond Financing <br /> BUDGETED <br />PROPERTY ACQUISITION <br />Purchase of Remaining Parcels 992,638 <br />Property Acquisition Subtotal: 5992,638 <br />CONTRAGTOR COST <br />58,476,084 <br />Shell 53,058,968 <br />P~g S2,180,519 <br />B~ ~ <br />Restore High Street Upon Mall Relocation ~5~~ <br />F~d~ral Art Requirement 554,297 <br />Subtotnl Contnctor Cost 513,814,868 <br />'I'ENANT Il~IPROVEMENTS <br />Marion County (81,397 sf Q S20) 51,627,940 <br />Salem Area Transit Tenant lmprovements (20,443sf (a~, S35) 5715,505 <br />Ground Floor Retail Tenant Improvements(3,896 (~ S 15) 558,440 <br />Hearing Room (5,302 Q S65) S344,630 <br />Snbtototal Teeant Improvemenb 52,746,515 <br />BUII.,DING DEMOLTTION 5842,026 <br />SOILS REMEDIATION 5348,000 <br />FEES & INSURANCE <br />P~~1~ 5179,593 <br />3ytems Development Charge (Transportation) 56,578 <br />Contractor Bond (Excluded on Tenant Improvement Work) S138,149 <br />Electrical Line Development Charge S 100,000 <br />Sanitary / Storm Sewer SDC 52,000 <br />Waur Meters S 1,000 <br />Other Pecmits 517,500 <br />Site Testing <br />522,500 <br />Concrete / Steel / Masonry Testing S~,~ <br />Builder's Risk Insurance S20,722 <br />Miscellaneous Permits Allowance 550,000 <br />Subtobd Fees and Iosurance 5604,042 <br />TOTAL. DIItECT COSTS (Eacludes Land): 518,355,451 <br />rnnix~cr cosTS: <br />,ARCHTfBCTURAL/CONSULTANTS <br />Architects (Tis on County and Transit Space - Excludes Streetscape) 51,410,810 <br />Engineers <br />included above <br />Space Planning / Work Drawin8s included above <br />Plan Reprodudion, Project Estimating, Other Consultants 5120,623 <br />Subtotal Arc6itectural / Consultanb 51,531,433 <br />O <br />~ <br />~~ <br />. ~ <br />