My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Portland General Electric- Meeting Minutes
>
CS_Courthouse Square
>
Portland General Electric- Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:27:23 AM
Creation date
8/17/2011 4:21:27 PM
Metadata
Fields
Template:
Building
RecordID
10279
Title
Portland General Electric- Meeting Minutes
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Energy
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Portland General Electric <br />LEONARD LODDER <br />APRIL 12, 1999 <br />PAGE TWO <br />7. A SEPARATE VAULT ROOM DR.AWING WILL BE MA.DE AVAILABLE WHEN SOME <br />MATERIAL HANDLING INFORMATION IS RECEIVED FROM A VENDOR. ONCE THIS <br />II~IFORMATION IS RECEIVED, WE CAN FINALIZE THE DESIGN WITH LEONARD, <br />TRACY, ~.ND BYRON. MAINTAIN 15'00 CLEARANCE TO ALL GAS VALVES. <br />B. PLACEMENT OF THE CONDUIT AND VAULT SYSTEM TO AVOID FUTURE CONFLICTS <br />WITH THE NORTH BLOCK DEVELOPMENT BY A PRIVATE DEVELOPER. <br />9. STREET LIGHT LOCATIONS. MIKE CROSSLAND AT PGE 503-463-4368 AND RICK <br />BARNES AT THE CITY OF SALEM 503-588-6211 ARE THE CONTACT PEOPLE FOR <br />LIGHTING INFORMATION AND INSTALLATION COSTS. A ONE LINE CONDUIT AND <br />JUNCTION BOX DESIGN ARE SHOWN ON DRAWING NUMBER 38874. <br />10. COORDINATE ALL TRENCH, CONDUIT, AND VAULT INSPECTIONS WITFi GLEN <br />DEVRIES AT 503-463-6102 OR 503-880-2166. <br />PORTLAND GENERAL ELECTRIC COMPANY 'AILL PROVIDE LABOR AND MATERIAL FOR <br />THE FOLLOWING: <br />l. THE COI~IDUIT INSTALLATION SHOWN ON PGE JOB NUMBER 38874 AS PGE WORK. <br />2. ALL PRZMARY AND SECONDARY CABLES TO THE SWITCHGEAR AND ONE THREE- <br />PHASE PAD MOUNTED TRANSFORMER. <br />S. DESIGN ASSISTANCE FOR ENERGY EFFICIENT BUILDING DESIGN IS AVAILABLE <br />FROM PGE'S EA.~THSMART PROGR.AM. RON COMSTOCK, 503-463-4347, IS THE <br />CONTACT PERSON FOR DESIGN II~IFOR,~iP.TION. <br />OUR TARIFF ALLOWS PGE TO PERFORM THE ABOVE DESCRI3ED WORK WITHIN OUR <br />ESTIMATED ALLOWANCE FOR YOUR PROJECT. IF YOU H?,VE ANY QUESTIONS, <br />PLEASE FEEL FREE TO CALL ME AT 463-4365. <br />SINCgagr.y, <br />~ ~~ p ~~~ <br />Mr1.4K D YOUNG <br />SERVICE & DESIGI~1 CONSULTANT <br />CC: TR.ACY HOKANSON, INTERFACE ENGI~ERING <br />BYROIV COURTS, MELVIDI MARK DEVELOPMENT COMPPu~7Y <br />R..~W Y CURT I S, M~..~ I ON COUNTY <br />RO[V COMSTOCK, PGE <br />PHIL 3ROWNcLL, u'~, EC Ei,ECTRIC~:., CONSTRUCTIODI CO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.