My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pence Kelley- Contract
>
CS_Courthouse Square
>
Pence Kelley- Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:40:59 AM
Creation date
8/17/2011 1:31:13 PM
Metadata
Fields
Template:
Building
RecordID
10269
Title
Pence Kelley- Contract
Company
Pence/Kelly
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ . <br />5.6 Subject to the provisions ot tlie Contract Documents, the amount of each progress payment shall be computed as follo~vs: , <br />~5.6.1. Take tl~at portion of tl~e Contract Sum properl_y allocable to completed Work as determined by multiplying the percentagc <br />complclion of each portion of t(-c Work by the share of the total Contract Sum allocated to that poriion of the Work in the Scliedule <br />of Values, icss rctainage of Gvc percent ( 5%) . Pending final determination of cost to the O~mer of cl~anges in tlie Work, amounts <br />not in dispuie ma_y be included as provided in Subparagrapl~ 7.3.7 of tl~e General Conditions even thoagh ihe Contract Sum has not <br />yc( bcen adjusted by Changc Order; <br />5.6.2 Add (l~at portion of tl~e Contract Sum properly allocable to materials and equipment delivered and suitab(y stored at tlie site <br />for subsequent incorporation in U~e completed construction (or, if approved in advance by the Owner, suitably stored of~' lhe site at a <br />location agreed upon in ~vriting), less retainage of percent (%); <br />5.6.3 Subtract the aggregate of previous payments made by the Owner, and <br />5.6.4 Subtract amounts, if any, ~-~v~~~e ,", ~~•~~~as withheld or nullified pursuant to a Certificate for Pa_yment as <br />provided in Paragraph 9.5 of the General Conditions. <br />5.7 The progress payment amount detennined in accordance with Paragraph 5.6 sl~all be furlher modi6ed under the following <br />circutnslances: <br />5.7.1 Add, upon Substantial Completion of tlie Work, a sum sufiicient to increase the total payments to ninety-five percent ( 95 <br />%) of t(~e Contract Sum, less such amounts as the Owner:~c#~e~ shall determine fbr incomplete Work and unsettled claims; and <br />5.7.2 Add, if final completion of the Work is thereafter materia(ly delayed through no fault of the Contractor, anv additional <br />amounts payable in accordance witl~ Subparagrapl~ 9.10.3 of the General Conditions. ~ <br />5.8 Reduction or limitation of retainage, if any, shall be as follows: <br />~(/f it is in(ended, prior ~o Substanlial Comple(ion ojthe en(ire Work, !o rediece or limit the retainage resul(ing jrom the percen(agea inserted in Si~bparagraphs S.G.1 <br />and 5.6.2 abore, and Ihrs is not exp/ained e/sewhere in !he Conlract Documenls, insert here prorisions for such redr~c(ion or limitation.) <br />n/a <br />ARTICLE 6 <br />FINAL PAYMENT <br />Final payment, constituting tlie entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) <br />the Contract has been fully pedormed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as <br />provided in Subparagrapli 12.2.2 of the General Conditions and to satisfy otl~er requirements, if any, whicli nocessarily survive final <br />payment; and (2) a finai Certificate for Payment has be~n issued by tlie Architect' and aCknowledged by tlte Ownet; such final <br />pa_yment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certifcate for Pa_yment. ';-e~ <br />~s-fe~lew~ <br />ARTICLE 7 <br />MISCELLANEOUS PROVISIONS <br />7.1 Where reference is made in tl~is Agreement to a provision of tlie General Conditions or anotlier Contract Document, the <br />reference refers to that provision as amended or supplemented by other provisions of the Coniract Documents. <br />~",A1A DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA • COPYRIGFIT 1987 • THE AMBRICAN INSTITITI'E OF <br />RCI~ITECTS, 1733 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006-5292. WARNING; Unlicen,ced pho~ocopying violates U.S. copyright laws and is <br />subjed lo legal prosecution. This document was electronically produced with pemiission ofthe AIA and can be reproduced without violation until Uie date ofexpiration as <br />not~d below. <br />Electronic Formal A101-1987 <br />User pocument: A101 -- 2/23/1999. AIA License Number 100632, which expires on 12/7/1999 - Page #4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.