Laserfiche WebLink
• PROTECTION OF PERSONS AND PROPERTY <br />10.1 SAFETY PRECAUTIONS AND PROGRAMS <br />10.1.1 The Contractor shall be responsible for initiating, <br />maintaining and supervising all safety precautions and <br />programs in connection with the performance of the Contract. <br />10.1.2 In the event the Contractor encounters on the site <br />material reasonably believed to be asbestos or <br />polychlorinated biphenyl (PCB) which has not been rendered <br />harmless, the Contractor shail immediately stop Work in the <br />area affected and report the condition to the Owner and <br />Architect in writing. The Work in the affected azea shatl not <br />thereafter be resumed except by written agreement of the <br />Owner and Contractor if in fact the material is asbestos or <br />polychlorinated biphenyl (PCB) and has not been rendered <br />harmless. The Work in the affected area shall be resumed in <br />the absence of asbestos or polychlorinated biphenyl (PCB), or <br />when it has been rendered harmless, by written agreement of <br />the Owner and Contractor, or in accordance with final <br />determination by the Architect on which arbitration has not <br />been demanded, or by arbitradon under Article 4. <br />10.1.3 The Contractor shall not be required pursuant to <br />Article 7 to perform without consent any Work relating to <br />asbestos or polychlorinated biphenyl (PCB). <br />10.1.4 To the fullest extent permitted by law, the Owner <br />shall indemnify and hold hazmless the Contractor, Architect, <br />ArchitecYs consultants and agents and employees of any of <br />them from and against claims, damages, losses and expenses, <br />including but not limited to attomeys' fees, arising out of or <br />tesulting from performance of the Work in the affected area if <br />in fact the material is asbestos or polychlorinated biphenyl <br />(PCB) and has not been rendered harmless, provided that <br />such claim, damage, loss or expense is attributable to bodily <br />injury, sickness, disease or death, or to injury, to or <br />destruction of tangible property (other than the Work itsel~ <br />including loss of use resulting therefrom, but only to the <br />extent caused in whole or in part by negligent acts or <br />omissions of the Owner, anyone directly or indirectly <br />employed by the Owner or anyone for whose acts the Owner <br />may be liable, regardless of whether or not such claim, <br />damage, loss or expense is caused in part by a party <br />indemnified hereunder. Such obligation shall not be <br />construed to negate, abridge, or reduce other righu or <br />obligations of indemnity which would otherwise exist as to a <br />party or person described in this Subparagraph 10.1.4. <br />10.2 SAFETY OF PERSONS AND PROPERTY <br />10.2.1 The Contractor shall take reasonable precautions for <br />safety of, and shall provide reasonable protection to prevent <br />damage, injury or loss to: <br />.1 employees on the Work and other persons who ma• ~ <br />be affected thereby; „~,r} <br />.2 the Work and materials and equipment to be <br />incorporated therein, whether in storage on or off the <br />site, under care, custody or conh~ol of the Contractor <br />or the Contractor's Subcontractors or <br />Sub-subcontractors; and <br />.3 other property at tt-e site or adjacent thereto, such as <br />trees, shrubs, lawns, walks, pavemenu, roadways, <br />structures and utilities not designated for removal, <br />relocation or replacement in the course of <br />constivction. <br />10.2.2 The Contractor shall give notices and comply with <br />applicable laws, ordinances, rules, regulations and lawfui <br />orders of public authorities bearing on safety of persons or <br />property or their protection from damage, injury or loss. <br />10.2.3 The Contractor shall erect and maintain, as required <br />by existing conditions and performance of the Contract, <br />reasonable safeguards for safety and protection, including <br />posting danger signs and other warnings against hazards, <br />promulgating safety regulations and notifying owners and <br />users of adjacent sites and utilities. <br />10.2.4 When use or storage of explosives or othe,~,,,,,~+'' <br />hazardous materials or equipment or unusual methods are <br />necessary for execution of the Work, the Contractor shall <br />exercise utmost care and carry on such activities under <br />supervision of properly qualified personnel. <br />10.2.5 The Contractor shall promptly remedy damage and <br />loss (other than damage or loss insured under properry <br />insurance required by the Contract Documents) to property <br />referred to in Clauses 10.2.12 and 10.2.1.3 caused in whole <br />or in part by the Contractor, a Subcontractor, a <br />Sub-subcontractor, or anyone directly or indirectly employed <br />by any of them, or by anyone for whose acts they may be <br />liable and for which the Conti-actor is responsible under <br />Clauses 10.2.1.2 and 10.2.1.3, except damage or loss <br />attributable to acts or omissions of the Owner or Architect or <br />anyone directly or indirectly employed by either of them, or <br />by anyone for whose acu either of them may be liable, and <br />not attributable to the fault or negligence of the Contractor. <br />The foregoing obligations of the Contractor are in addition to <br />the Contractor's obligations under Paragraph 3.18. <br />10.2.6 The Contractor shall designate a responsible member <br />of the Contractor's organization at the site whose duty sha(I <br />be the prevention of accidenu. This person shall be the <br />Owner-Contractor Agreement General Conditions Supplement (For AIA Doc. A201) <br />Paye - User pocument: A201 -- 12/29/1998. AIA License Number 100632, which expires on 12/7/1999 -- Pag~'rl <br />