Whea Arbitntion May Be Demaaded 4.5.4
<br />Work, Definition of 1.13
<br />Written Conscnt 1.3.1, 3.12.8, 3.14.2, 4.1.2, 43.4,
<br />~; 4.5.5,9.32,9.8.2,9.9.1,9.10.2,9.10.3, 10.I.2, 10.1.3
<br />11.3.1,113.1.4,11.3.11,t3.2,13.4.2
<br />Written Interpretations 4.2.1(, 4.2.(2, 4.3.7
<br />Written Notice 2.3, 2.4, 3.9, 3.12.8, 3.12.9, 4.3, 4.4.4, -
<br />4.5.5.2.t,53,5.4.1.1,8.2Z,9.4.1,9.5.1,9.7,9.10, IO.l.2,
<br />10.2.6, 11.1.3, 113, 12Z.2, 12.2.4, 133, 13.5.2, 14
<br />Written Orders 23, 3.9, 4.3.7,
<br />7, 8ZZ, 113.9, 12.1, 122, 13.5.2, 143.1
<br />[A DOCUMENT A201 - GETIERAL CONDIT[ONS OF THE CONTRACT FOR CONSTRUCTION - FOURTEENTH EDIT[ON - AIA - COPYRIGHT 1987 -
<br />~HE AMERICAN MSTITUTE OF ARCMTECTS, 1735 NEW YORIC AVENUE N.W., WASHINGTON D.C. 20006-5292.. WARNING; Uolicensed
<br />photocopying violates U.S. copyright Iaws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be
<br />rcproduccd without violation until the date of expiration as noted below.
<br />E(ectronic Format A20.1-1987
<br />User pocument: A201 -12/29/1998. AIA License Numbe~ 100632, which expires on 12/7/19gg - page #6
<br />
|