My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pence Kelley- Contract
>
CS_Courthouse Square
>
Pence Kelley- Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:40:59 AM
Creation date
8/17/2011 1:31:13 PM
Metadata
Fields
Template:
Building
RecordID
10269
Title
Pence Kelley- Contract
Company
Pence/Kelly
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, . <br />f <br />~ <br />-- - --- - - _ --- - .. <br />------ . <br />_---- -------- - _ ---------_ --- -- _ _ _ ~. . . <br />Exhibit 'F' <br />ADDENDUM TO CONTRACT, FTA CONTRACT REQUIREMENTS <br />• ~ ' Page 14 of 23 <br />(c) A payment bond is required only when a performance bond is required, and if the use of <br />payment bond is in the Recipient's interest. <br />(d) When it is deternuned that a payment bond is required, the Contractor shall be required to obtain <br />payment bonds as follows: <br />1. The penal amount of payment bonds shall equal: , <br />(i) Fifty percent of the contract price if the contract price is not more than $1 million; <br />(ii) Forty percent of the contract price if the contract price is more than $1 million but not more than <br />$5 million; or <br />(iii) Two and one half million if the contract price is increased. <br />Advance Payment Bonding Requirements ~ <br />The Contractor may be required to obtain an advance payment bond if the contract contains an <br />advance payment provision and a performance bond is not fumished. The Recipient shall detemune <br />the amount of the advance payment bond necessary to protect the Recipient. If the Recipient <br />requires such bonding after execudon of the Contract, then Recipient will pay the reasonable cost of <br />the bond premium. <br />Patent Infringement Bonding Requirements (Patent Indemnity) <br />The Contractor may be required to obtain a patent indemnity bond if a performance bond is not <br />furnished and the financial responsibility of the Contractor is unknown or doubtful. The Recipient <br />~, shall determine the amount of the patent indemnity to protect the Recipien~ If the Recipient requires <br />such bonding after execution of the Contract, then Recipient will pay the reasonable cost of the bond <br />premium. <br />Warranty of the Work and Maintenance Bonds (Construction Contracts) <br />1. The Contractor warrants to Recipient, ttie Architect and/or Engineer that all materials and <br />equipment furnished ander this Contract will be of tughest quality and new unless otherwise specified <br />by Recipient, free from faults and defects and in conform,ance with the Contract Documents. All work <br />not so conforming to these standards shall be considered defective. If required by the Recipient, the <br />Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. <br />2. The Work furnished must be of first quality and the worlananship must be the best obtainable in <br />the various trades. The Work must be of safe, substantial and durable construction in all respects. The <br />Contractor hereby guazantees the Work against defective materials or faulty workmanship for a <br />minimum period of one (1) year after Final Payment by Recipient and shall replace or repair any <br />defective materials or equipment or faulty workmanship during the period of the guarantee at no cost <br />to Recipient~ As additional security for these guarantees, the Contractor shall, prior to the release of <br />Final Payment, furnish sepazate Maintenance (or Guarantee) Bonds in form acceptable to Recipient <br />written by the same corporate surety that provides the Performance Bond and Labor and Material <br />Payment Bond for this Contract. These bonds shall secure the Contractor's obligation to replace or <br />repair defective materials and faulty workmanship for a minimum period of one (1) year after Final <br />Payment and shall be written in an amount equal to ONE HiJNDRED PERCENT (1009b) of the <br />CONTRACT SLJM, as adjusted (if at all). <br />Addendum, FI'A Contract Requirements <br />Page - 13 <br />0223990116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.