Laserfiche WebLink
Port o~ "ortland <br />Administ ..cive Of~ces <br />Job Cost Projection <br /> <br />Description Original <br />Budget Changes <br />to Date Current <br />Budget Committed <br />Cost to Date Cost to be <br />Committed Projected <br />Cost Variance <br />Thermal & Moisture Protection <br />Traffic/PedestrianToppings 21,105 0 21,1OS 73,105 0 73,105 (52 <br />000) <br />Fireproofing 241,012 0 241,012 241,012 0 241,012 , <br />p <br />Parking Level Insulation 32,480 892 33,372 33,372 0 33,372 p <br />Flashing & Sheet Metal 25,200 2,50o 27,700 27,70~ 0 27,700 p <br />RoofinB 87,120 0 87,120 87,120 0 87,120 0 <br />Roof Hatches & Screen 53,000 1,200 54,200 54,200 0 5~,200 Q <br />Doors/Windows/Hardware <br />DoorslFramesllIardware 65,500 2,250 67,750 67,750 0 67,'I50 ~ <br />Aluminum Glass/Glazing 499,512 37,455 536,967 536,967 0 536,967 p <br />Curtainwall 101,815 0 101,815 101,815 0 101,815 ~ <br />Coiling Doors 12,000 0 12,000 12,000 0 12,000 ~ <br />Finishes <br />Drywall/Metal Studs/Ceilings 433,669 (2,194) 431,475 431,475 ~ 431,475 p <br />Carpeting & VinylFlooring 12,000 60 12,060 12,060 0 12,060 p <br />CeramicTile 36,000 12,384 48,384 48,384 0 48,384 p <br />Painting & Wall Covering 48,200 3,000 51,200 S 1,200 0 5],2p0 p <br />Accessories <br />Fire Extinguishers 5,000 0 5,000 5,000 0 5,000 p <br />Toilet PartitionslAccessories 16,000 5,00~ 21,000 21,000 0 21,000 p <br />Signage 8,500 0 8,500 8,500 0 g,500 p <br />Conveying Systems <br />Elevators 400,500 I5,000 415,500 415,504 0 41 ~,500 p <br />Mechanic~l <br />Fire Protection 212,530 0 212,530 212,53~ 0 212,530 p <br />Plumbing 165,552 10,952 176,504 176,504 0 176,504 p <br />HVAC 843,281 750 844,031 844,031 0 844,031 0 <br />1l27/99 <br />Page 2 of 4 <br />