My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miscellaneous Correspondence
>
CS_Courthouse Square
>
Miscellaneous Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:28:22 PM
Creation date
8/16/2011 1:46:15 PM
Metadata
Fields
Template:
Building
RecordID
10387
Title
Miscellaneous Correspondence
BLDG Date
1/1/2000
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br />MIKE VAWTER, P.E. <br />PROJECT MANAGER <br />Mechanical Engineer <br />System Balance Engineer <br />Field Supervisor <br />NEUDORFER ENGINEERS, INC. <br />Mr. Vawter joined the firm in 1993, and moved to Portland as the Project Manager for the Portland Branch Office in <br />1996. He holds a Bachelor of Science degree in Mechanical Engineering from the University of Washington. <br />His balancing experience includes constant and variable air volumes systems, high and low velocity systems, <br />packaged and central air systems and hot water hydronic systems. He also has experience in sound and <br />vibration and cleanroom systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.