My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miscellaneous Correspondence
>
CS_Courthouse Square
>
Miscellaneous Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:28:22 PM
Creation date
8/16/2011 1:46:15 PM
Metadata
Fields
Template:
Building
RecordID
10387
Title
Miscellaneous Correspondence
BLDG Date
1/1/2000
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
costs would be a department <br />responsibility or purchased by the <br />county at the recommendation of <br />ISMT. Recommendation: Forward <br />this issue to ISMT for further review <br />and budget analysis. <br />5 <br />6. <br />7. <br />8 <br />Special Data <br />Connections PE $ 30,000 This item reflects the cost of <br />C~ ~~ ~ extending new conduit under Court <br /> Street for ph/data connections <br /> between the Courthouse and Ch2. <br /> Bob McCune will work with the <br />~ architect to obtain cost estimates. <br />~~~ <br />Automated ~ y <br />filing System r DE $? Four departments have expressed <br /> interest in automated space savor <br /> type filing systems. Richard <br /> Strickland is working with vendors <br /> to define equipment options, cost <br /> estimates and procurement <br /> procedures. <br />Electrical <br />Connections PE/FB/DE $13,000 Floor plans are being refined to <br />identify all necessary electrical <br />S~ f~~ ~..~' ~ connections for office equipment and <br />modular office units. Normally, the <br />final connections to office furnishing <br />is a department expense. The work <br />will be performed by facilities staff. <br />(policy issue) Should this expense be <br />added to the project allowance or <br />budgeted as a facility or department <br />expense? Price based on 117 power <br />drops to work stations. <br />Transformer N/A $ 0 The location of the transformer has <br />tentatively been resolved with PGE. <br />The in-ground location on the east <br />side of the building does not appear <br />to have any additional costs to the <br />proj ect. <br />
The URL can be used to link to this page
Your browser does not support the video tag.