Laserfiche WebLink
February 12, 1999 <br />Billy F. Wasson <br />Counhouse Square Manager <br />Marion Cou~ty Annex <br />3150 Lancaste~ Or. NE <br />Salem, OR 97305-1398 <br />Courthouse Square Urban Re~ewal Agency Participation <br />Dear Mr. Wasson, <br />CI~Y <br />OF~SALEM, <br />OREGON <br />Gry Han i 555 l.ibeny S~. S.E <br />I~p Code 973p1 <br />c~rir ~-r,ncEFrs oFFicE <br />Telephone (503) 568~255 <br />The construction bid appendix sheets for the elements of Agency participation in the <br />Cou~thouse Square project were ~eceived Friday, February 5. 1999. We have reviewed and <br />compared the six bids and associated line item detail. While Pence/Kelly Const~uction, Inc. is <br />lhe apparent low bidder for the total Courthouse Square project they are also the high bidder for <br />the elements o( Agency pa~ticipation. Anlicipating this condition could arise, our agreement. <br />which ~emains to be signed and returned for my counler signature, provides the following: <br />P~ior to construction contract bid award for the items of Agency participation, lhe <br />low bid recommended for award by the County and Transit Oistrict shall be <br />submilted to the Agency. The Agency will designate in writing within five (5) <br />days of submission, acceptance, rejection or designation of bid alternate for <br />which the Agency will provide participation. Agency approval for pa~ticipation will <br />not be un~easonably withheld, howeve~, reasons ior withholding of such approval <br />shall include but not be limited to bid irregularity or unreasonable unit cost. <br />Agency acknowledges that the low bidde~ for the entire P~oject construction may <br />not necessarily ~epresent the lowest bid tendered for each of the specific areas <br />of Agency panicipation designated in Section 1, however, in the event the <br />Agency finds unit cost to be unreasonable, Agency may designate an acceptable <br />level of participation for the respective item. <br />Aiter adjusting for the Agency maximum participati~n in weather protection of $160 per lineal <br />(oot, the base bid for all elements of Agency pa~ticipation tendered by Pence/Kelly is <br />$1.314,979. By comparison, the other five bids range from a low of $821,g10 to a high of <br />$1.003,695. <br />As you will recall in a meeting held with our staff on February 3,1998, this very condition was <br />discussed. It was concluded, to determine an "acceptable level of participation" (or the Agency, <br />a comparison woutd be made to an amount of 120% of the median price of all bids. The <br />attached schedules enumerate all bids, the median, and a value representing 120% of inedian. <br />~ <br />s«..- a.oe.~ <br />.u-..Rrc. a.. <br />' ' ' ' <br />~NI• ~~~! <br />-- AN EQUAL OPPOqTUNITY EMP <br />ATTACHMENT 4 <br />