10/16/2000 12:05 FAX 50~ 581 ~655 ARBUCKLE CO5TIC ~ BILLY WASSON ~008/012
<br />ITEM ROOM NO./ REMARKS ' ,,COM~!~ETED ~
<br />NO. LOCATION ~ :
<br /> and Assembly 1233. ' "" , '- ;,;~'
<br />:i,li ''~,,,, ',,,~~
<br />32. Passage 1248 Poor installation of the type X1 and X2 exist signs above door to /;1~3/0a"~"
<br />'1~,0
<br />~
<br />'~ ~~I
<br /> exterior. Correct the installation. , ,
<br />~~,~~ ~ ~ ,
<br />~ '
<br />~ ~~"~'~~'~
<br />33. Passage 1248 Provide device for junction box at east end of passage. I believe this ~~1~q/1,~'(,;0,0;;
<br /> is intended to be a Fire Alarm Pull Station i ~~ ~ ,'~~~
<br />34. Storage 1250 Provide cover for junction box. ~~~~0/;1;3'/,0,0,; ;
<br />35. Women 1251 Install lens on type J1 luminaire. (10/13/00- Clean the Lens) ;;9~0/1~3YQ0;!N,~X~i
<br /> ~ i~on;e!~ezceptiio~i';
<br />36_ AudioNisual Luminaire above door to Corndor 1254 has ballast that is going bad. '~ ~~~~ ~"' ~'°~~`~~,,;`;'
<br />;
<br />"""' "'~
<br /> 1253 Replace Ballast ,
<br />,
<br />37. AudioNisual Four outlets for CAN are not installed. Provide these outlets. ~ "' ~"!; ~'
<br />~~
<br /> 1253 ~ ; ~ ,,,,
<br />38_ Corridor 125a Provide Cardreader at door to AudioNisual 1253 ~;~ ~
<br />39. Breakroom 1270 The undercounter type G1 luminaire is not~operational. Correct this. ~"10%-1,3'/,0;0;?ii;ii;i,r„~~ ;
<br />40. Securiiy Coord Provide faceplates for receptacles. , ~~~;0/1~3~00'~~
<br /> 1280 i° i!~ ~ ;';:~; ~ ~; ~' ~~i
<br />~
<br />'
<br />'
<br />41. General Clean all luminaires_ (10/13/00 - There are areas where this has yet ~~~
<br />°
<br />~'"
<br /> to be done) ,,,!~;!~
<br /> , ~~~~~~ ~ 1' i~Ai~~~~
<br />
<br /> SECOND FLOOR ELECTRICAL SUBSTANTIAL COMPLETION ii'~~,'.;
<br /> PUNCHLIST ~ ~ ~i'~ ,„~"^~~
<br />1 Gene~al In lar e rooms and o en s aces switches aren't wired to the
<br />9 P P " ,3/00~~
<br />,,1~0/~ ;; ; ,
<br /> corresponding lights as shown in the plans
<br />2 General Power poles aren't installed as shown in the plans. ~10~f1~31Q'0;~
<br />3 General The installation of all duplex receptacles and telephone/data 'ii1i0/~:3~OQ~ ,~
<br /> combinations that are flush floor mounted is incomplete_ ,~;; '` ' ~~~~' ,~`~~'
<br />~
<br />4 Building Plans call for a doubte duplex receptacle mounted in the casework ,
<br /> Inspection while only a duplex receptacle is installed. ' '~~'
<br />'~
<br /> Reception 2171 ~ ,,,,,"'
<br />5 Conference Combination telephone/data outlet on the north wall isn't present as ~~~~'QY;13'/,;~,O;r;',;~,,,,~; °
<br /> 2201 shown on the plans. ~ ~'s'~
<br />6 Deeds/Maps The installation of the combi~ation telephone/data outlet mounted in ~;~;0/;f;3~D0; ~;°
<br />'
<br /> 2234 the casework isn't complete_ ~ ~'r '`'' ;'~~~
<br />~~ ~ , ~
<br />,,; ~~ "~~ ~
<br />7 Office 2193 The plans call for a junction box with a flex!connection to be provided „10~r13/00~~,'
<br />~
<br /> with a blank faceplate for future connection, to system fumiture on the ' ~~`" ~~~~ ~
<br />~
<br />~
<br />1
<br />1
<br /> outer eastem wall of the office, but a duplex receptacle is installed in 's~~'' ~
<br />~'~~''
<br />"'' '~','`'~
<br />"
<br />I
<br />i
<br />~
<br /> its place. ' ,.
<br />~~
<br />'
<br />~~
<br />8 Office 2193 Television outlet isn't installed on the north wall as shown in the ; ; ;
<br />,
<br /> plans. ~~~'„ ,,, ,;?',; ''~" ' ;' ,;;;; ~;i'
<br /> '
<br />~
<br />
<br />THIRD FLOOR ELECTRICAL SUBSTANTIqL COMPLETION ;~; ;~
<br />,; .,,,,
<br />r,i, ,c~,.,'~~ ,~; ; ;; ; ~ ~ ; ;;;
<br /> PUNCHLIST ~
<br />;~; ",i',;
<br />~'~" ,,,
<br />1 General The ceiling and the lighting in the open area in the southwest are not ~„'~1`0%1,3/,Q',0~ ,°
<br /> completely installed. ~ ~ ``"''~f'
<br />, „ „~,,, ,,, ,,,, ,,,,, , ~, ,,,,,,, , „ ~ ,.
<br />2 Waiting 3120 Luminaire type'H1' isn't installed as shown,in the plans. ~~ 1;~/1,3/„O,Q; ;;;;''r;,;;;,',"; ;
<br />3 Waiting 3120 Luminaire type 'D1' isn't installed as shownlin the plans. ~~10~~13/Q,O;;!;'„",., ,
<br />4 Work Room Flush floor combination telephone/data outlet isn't installed as shown ~~~
<br /> 3121 in the plans. ~
<br />~ ,:'
<br />~
<br />5 Work Room Flush floor duplex receptacle isn't installed as shown in the plans.
<br /> 3121 ~ ~~,; „ , , ;,;,ii
<br />6 Work Room Louver on the southeastern luminaire is damaged. ~`yi0'/,;"~;,3'/O,O;i
<br />~
<br />We are proceeding with the project based on the above etateme~ats being correct. Please notify
<br />Interface Engineering, tnc. immediate~y if there are dny corrections or additions to this document.
<br />M:\9628\Clerical\Observation Rsports~lVl+E Punch li~ta~Elect Site Vieit Reports_doe Page 4 of 8
<br />
|