My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Floor Plan- Changes
>
CS_Courthouse Square
>
Floor Plan- Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:03:10 AM
Creation date
8/15/2011 11:47:58 AM
Metadata
Fields
Template:
Building
RecordID
10243
Title
Floor Plan- Changes
Company
Arbuckle Costic
BLDG Date
4/28/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: "Leonard Lodder" <Ilodder@arbucklecostic.com> <br />To: "'Billy Wasson"' <bwasson@opengovt.open.org> <br />Date: Mon, Nov 15, 1999 1:45 PM <br />Subject: RE: Clarification of Solid Waste items, PR 50 <br />Billy <br />The item labeled "Premium for Solid Waste Space Finishes" provides a <br />prorated increase in cost related to the original Add Alternate of $45,000 <br />on Solid Waste's space for alternate finishes, applied at a per sq.ft. rate <br />to the increase in area which they have acquired. <br />I have reviewed the issue of the cinder-crete with Dave Hays and it would <br />appear that Jim is right, however the size of the reception counter is <br />larger than before the T.I. changes. <br />We have heard about the safe, and assume that it will be pulled from the <br />P.R. <br />Leonard Lodder, A.I.A. <br />Arbuckle Costic Architects, Inc. <br />363 State Street, <br />Salem, OR 97301-3533 <br />email: Ilodder@arbucklecostic.com <mailto:llodder@arbucklecostic.com> <br />
The URL can be used to link to this page
Your browser does not support the video tag.