Laserfiche WebLink
Initialed <br />Salem Courthouse Square Project <br />Abatement and Demolition <br />Addendum #2 <br />March 27, 1997 <br />Item 1: <br />The abatement proposals are effected by the selection of either a 60 day or 90 day demolition <br />completion date. Attached to this addendum are two proposal forms for abatement that reflect <br />both a 60 day and 90 day total project completion schedule and Demolition Proposal forms that <br />include an Attachment A. Please use these revised forms to submit your abatement proposals. <br />Item 2: <br />Answer to Question #5 on Addendum #1: <br />5. The noise levels were thought to be to strict and at realistically unattainable levels for this <br />type of project. Can County specified levels be raised to the federal OSHA standards of <br />85DB. with the exceptions of spike levels possible exceeding these limits after normal <br />public working hours? (When and how could a waiver be granted for exceeding 85db for <br />certain tasks?) <br />Mazion County has looked into noise level restrictions and we believe the standard listed <br />in the specifications can be adjusted. The descible restriction will be negotiated between <br />the owner and the contractor and must be within acceptable OSHA standards and meet <br />City of Salem restrictions. <br />Item 3: <br />Attached to this addendum is a location map of Marion County solid waste disposal facilities and <br />information sheet regazding materials that are accepted from public haulers. <br />Courthouse Squaze Project <br />Amendment #2 <br />Mazch 27, 1997 <br />