My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Correspondence
>
CS_Courthouse Square
>
Demolition Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:20:52 PM
Creation date
8/10/2011 12:23:51 PM
Metadata
Fields
Template:
Building
RecordID
10112
Title
Demolition Correspondence
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SALEM COURTHOUSE SQUARE, INC. <br />ASBESTOS ABATEMENT <br />1997 <br />PROPOSAL <br />SECTION 00300 <br />RFP <br />PAGE 1 OF 2 <br />SALEM COURTHOUSE SQUARE, INC. <br />ASBESTOS ABATEMENT <br />OF <br />ALL STRUCTURES BOUNDED BY COURT STREET, CHURCH STREET, <br />CHEMEKETA and HIGH STREET IN SALEM, OREGON <br />1997 <br />301 This abatement must be coordinated with the demolition contractor to meet established dates of <br />completion. Having carefully examined the project specifications and conditions relating to the work, <br />the undersigned agrees to enter into a contract with Mazion County to furnish all labor, materials and <br />other services required by, and in strict accordance with the plans and specifications for the following <br />sum: <br />Base Proposal Amount: <br />Remove and dispose of all asbestos containing materials except materials aloud to remain as demolition <br />debris such as asphalt impregnated mastics and roofing materials. This project includes a Base Proposal <br />of removal and disposal of approximately 12,000 ln. ft. of Thermal System Insulation, 5,814 sq. ft. of <br />Sheet Vinyl Flooring, 29,388 sq. ft. of 9x9 and 12x12 Floor Tile, 370 sq. ft. of Floor Tile under Sheet <br />Vinyl, 80 sq. ft.of Furnace Lining, 315 sq. ft. of Cement Asbestos Board, all Fire Doors, 1,856 sq.ft. of <br />Drywa11 and Taping Compound, 696 sq. ft. of lxl Ceiling Tile and Mastic, 3,000 sq. ft. of friable built- <br />up Roofing, 7,950 sq. ft. of Ceiling Acoustical, Cove Base Mastic, 200 sq. ft of Stair Tread Mastic, <br />2,100 sq. ft. of Duct Insulation, 10 sq. ft. of Vibration Joint Cloth, Leveling Compound in flooring, <br />3,400 sq. ft. of 2x4 Ceiling Tile, all Silver Paint on ducts and flashing, 12,000 sq. ft. of Silver Paint on <br />built-up roofing, 600 sq. ft. of Flashing Sealer Cloth, 5,000 sq. ft. of Plaster Exterior building material, <br />160 sq. ft. Ceramic Tile Mastic, 360 sq. Ft. of Carpet Mastic and make pliable 30,387 sq. ft. of 9x9 and <br />12x 12 Floor Tile Mastic. <br />Dollars Cents <br />Additive Alternate Proposals: <br />$ <br />Per-Unit Cost for the removal and disposal of Thermal System Insulation: cosdsq.ft......... $ <br />Per-Unit Cost for the removal and disposal of Thermal System Insulation:cost/in.ft.......... $ <br />Per-Unit Cost for the removal and disposal Of additional Floor Tile: costJsq.ft .................. $ <br />Per-Unit Cost for the removal and disposal of DrywalUTaping Compound: costlsq.ft. ...$ <br />Per-Unit Cost for the removal and disposal of Sheet Vinyl: cosdsq.ft . . . . . . . . . . . . . . . . $ <br />Per-Unit Cost for the removal and disposal of built-up Roofing: cost/sq.ft . . . . . . . . . . . . $ <br />Per-Unit Cost for the removal and disposal of Ceiling Acoustical: cosbsq.ft. ..........$ <br />Courthouse Square Project <br />Amendment #1 <br />March 24, 1997 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.