My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Correspondence
>
CS_Courthouse Square
>
Demolition Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:20:52 PM
Creation date
8/10/2011 12:23:51 PM
Metadata
Fields
Template:
Building
RecordID
10112
Title
Demolition Correspondence
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SALEM COURTHOUSE SQUARE INC. <br />DEMOLITION <br />1997 <br />1.1 CONTRACTOR USE OF THE SITE <br />SECTION 01043 <br />PROJECT COORDINATION <br />PAGE 1 OF 1 <br />A. Public azeas at the project site may remain occupied by the Owner and the public in connection with the <br />Owner's ordinary operations. The Contractor shall at al,l times perform the work so as to cause the <br />least inconvenience possible to the Owner, the public, and other contractors. <br />B. The Contractor shall minimize the amount of space used for storage of materials and debris in <br />connection with the work and sha11 at all times maintain the work area in a neat and orderly manner. <br />The Contractor shall coordinate lus use of the project site and its space requirements with the Owner's <br />Representative. The Contractor shall limit the use of the premises for work and storage, and <br />coordinate his activities with other contractors working in the area. <br />C. The Contractor assumes full responsibility for the protection and safekeeping of his materials and <br />equipment used and stored on the project site. The Contractor shall protect all existing objects and <br />finishes from damage during the abatement. In the event of damage to existing building equipment, <br />the Contractor will notify the Owner's Representative immediately, and the damage will be repaired at <br />the Contractor's expense. <br />D. Designate bathroom facilities for workers will be provided by the Abatement contractor. <br />1.2 PROJECT MEETINGS <br />The contractor may be required to attend project coordination meetings during the project as scheduled by <br />the Owner or his representative. <br />1.3 PRE-CONSTRUCTION MEETING <br />The Contractor shall attend a pre-construction meeting to present his work plan and project schedule and <br />discuss matters specific to the project. <br />A. Agenda: <br />1. Distribute and discuss tentative Asbestos Removal and Demolition schedule. <br />2. Discuss processing of field decisions, Demolition Change authorizations, and Change Orders. <br />3. Discuss Procedure for maintaining Project Record Documents. <br />4. Discuss use of premises, including site, elcisting building, storage areas, and security. <br />5. Discuss deliveries, safety, parking, housekeeping. <br />~ND OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.