My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Correspondence
>
CS_Courthouse Square
>
Demolition Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:20:52 PM
Creation date
8/10/2011 12:23:51 PM
Metadata
Fields
Template:
Building
RecordID
10112
Title
Demolition Correspondence
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DETERMINATION 97-01 CONSTRUCTION TYPE: <br />BASIC <br />HOURLY FRINGE <br />RATE BENEFITS <br />HEAVY-ENTIRE STATE, HIGHWAY-ENTIRE STATE. <br />NON-RESIDENTIAL BLDG. EXCLUDES COOS, CURRY, <br />DOUGLAS & JOSEPHINE COUNTIES <br />BASIC <br />HOURLY FRINGE <br />TRADE RATE BENEFITS <br />Zones for Groups 5, 6 and 7 Carpenters are determined as <br />follows: <br />~ 1. For those workers who reside within zone 1 of a <br />~ reference city below, their zone pay differential <br />shall be computed based upon the distance from <br />the city hall of that city to the project site. <br />2. For those workers who reside nearer to the project <br />than is the city hall of any reference city below, <br />the mileage from their residence to the project may <br />be used in computing their zone pay differential. <br />3. The zone pay differential for all other projects shall <br />be computed from the city hall of Longview, North <br />Bend, or Portland, whichever is closer to the <br />project. <br />Reference Cities for Grou~s 5. 6 and 7 <br />Astoria Eugene Newport Salem <br />Bend Klamath Falls Portland The Dalles <br />North Bend Medford Roseburg Longview <br />Grou~ Grou~ <br />Auto. Nailing Machine Floor Layers & Finishers <br />Carpenters Stationary Power Saw <br />Form Stripper Operators <br />Manhole Builders Wall & Ceiling Insulators <br />Non-irritating Ins. Irritating Insulation <br />Cabinet & Shelving <br />Installers (wood or steel) <br />Grou~ Grou~ 4 <br />Millwrights Millwright/Welders <br />Machine Erectors (Certified Welders receive <br />Machinists 50.25/hour over Group 3) <br />Grou{~ Gro~_6 <br />, Bridge, Dock & Wharf Boom Men <br />~ Builders <br />Piledrivermen <br />GrouR 7 <br />Marine Piledriver <br />CEMENT MASONS <br />Zone 1 (Base Rate): <br />o Group 1 20.64 6.62 <br />o Group 2 21.01 6.62 <br />o Group 3 21.01 6.62 <br />o Group 4 21.39 6.62 <br />Cement Masons, finishing, hand chipping and <br />patching grouting, end pointing, screed <br />setting, plugging, filling bolt holes, dry packing, <br />setting curb forms, planks, stakes, lines and <br />grades. <br />Composition Workers (includes installation of <br />epoxy & other resinous toppings), and Power <br />Machine Operators. <br />,~ Cement masons working on suspended, <br />swinging and/or hanging scaffold. <br />} Cement Masons performing work of both <br />Group 2 and Group 3 at the same time. <br />Zone Differential for Cement Masons <br />(Add to Zone 1 Rate) <br />Zone 2 .65 <br />Zone 3 1.15 <br />Zone 4 1.70 <br />Zone 5 2.75 <br />. Projects within 30 miles of City Hall in the <br />cities listed below. <br />. More than 30 miles but less than 40 miles. <br />. More than 40 miles but less than 50 miles. <br />. More than 50 miles but less than 80 miles. <br />. More than 80 miles. <br />Eugene Medford Salem Vancouver <br />lis Longview Portland The Dalles <br />o Divers <br />o Divers' Tenders <br />52.34 6.52 <br />23.83 6.52 <br />Depth Pay and Enclosure Pay are added to the <br />Divers' Basic Hourly Rate to obtain the Total Hourly <br />Rate for the diver. <br />1SIC HOURLY HOURLY DIVERS' <br />~URLY + DEPTH + ENCLOSURE = TOTAL <br />>TE PAY PAY HOURLY PAY <br />Divers' Depth Pay <br />De[~th of Dive Hourjy DeRth Pav <br />50-100 ft ([total ft- 501 x 51.001/hr. <br />100-150 ft S 50 +([total ft-100] x 51.50)/hr. <br />150-200 ft 5125 +([total ft-1501 x S2.001/hr. <br />JANUARY 1, 1997 PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.