My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings EMT Workshop
>
CS_Courthouse Square
>
Meetings EMT Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:38:48 AM
Creation date
8/5/2011 3:46:13 PM
Metadata
Fields
Template:
Building
RecordID
10097
Title
Meetings EMT Workshop
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSULTATInN (continued) <br />The reversion value is based.on the following analysis. The current land cost basis used in <br />the analysis is $2,182,664 plus the reported development cost of the improvements less the <br />transit distdct grant which results in a total building cost of $18,643,485 for Marion County. <br />It is difficult to forecast the future reversionary value (26 years ahead). Aowever, it is <br />recognized that construction costs are escalating, and it is very probable that the future value <br />will exceed the current costs, assuming good maintenance of the structure and value <br />escalafion influences offsetting any depreciation. 'I'herefore, the cunent land cost basis and <br />building cost for Marion County's portion will be used as the reversionary value. Adding <br />the cost basis of the land at $2,182,664 results in a total reversionary value estimate of <br />$20,826,149 in 1998 dollars. <br />For purposes of this compacative analysis, the actual reversionary value will be deducted to <br />indicate Uie net asset position for Marion County, recognizing that the reversionary interest <br />reflects a future asset value. This technique will result in a total net comparison on a per <br />square foot basis of the leasing scenario versus the scheduled rent/ownership scenario. <br />' The previously reported discount rates will also be applied in this technique. Calculaflons <br />of the present value are presented on the following Lease Versus Contract RenUOwnership <br />Analysis Tabulation Chart. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.