My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings EMT Workshop
>
CS_Courthouse Square
>
Meetings EMT Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:38:48 AM
Creation date
8/5/2011 3:46:13 PM
Metadata
Fields
Template:
Building
RecordID
10097
Title
Meetings EMT Workshop
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
}L ~ Kimfvbuckle,PJ~ <br />"8' Nan E Cosnc, AlA <br />Wal[er E Bensman, Jc, AlA <br />Clay[on Vorse, NA <br />Richard S. Ro[hweiler, AL1 <br />January 13, 1998 <br />i <br />Randy Curfis, Director <br />Marion County General Services <br />100 High Street NE <br />Salem, Oregon 97301 <br />RE: Programming Process <br />Marion County Space Planring <br />Courthouse Square <br />ProJect No. 9742 <br />DearRandy <br />COSTIC ARCHITECfS, INC. <br />114 Fax:503/5813655 <br />At your request we are providing a description of ihe Spece Planning/Programming Process utilized during our <br />involvement with this proJect. <br />Initially, we received from Marion County e copy of the Facilifies Mester Plan, dated December 1993, prepared by the <br />W.E. Group. In eddfion, Ma~ion County provided an update to the'Spece Requirement Summery" Ilsted es Exhitrit <br />No. 3 from the above referenced report. In September of 1996, staff from Arbuckle Costic Architects interviewed <br />Department Heads of County Departments deslgnated to move Into Courthouse Square. The interview process was <br />deslgned to obtaln famlliarfty with the current space planning requirements and veriflcatlon of staff growth trends shown <br />in the W.E. Group report A four page working document, dated September 30, 1996, was produced as a supplement <br />to the programming information previously received. <br />During June and July of 1997, following a review of the working document by you end other County staff, interiors staff <br />from Arbuckle Costic Architects again Interviewed steff et each of the designated County Departments, preparatory to <br />running a design test on the avafloble offlce space. The resulls of this Interview process are recorded in the form of <br />rough notes as well es the preliminary space planning layouts produced for departmental review. <br />Should you have any questlons concerning the above referenced process, please call. <br />Sincere , <br />eonard Lodder, A.I.A. <br />AmhHar.t <br />
The URL can be used to link to this page
Your browser does not support the video tag.