My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings EMT Workshop
>
CS_Courthouse Square
>
Meetings EMT Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:38:48 AM
Creation date
8/5/2011 3:46:13 PM
Metadata
Fields
Template:
Building
RecordID
10097
Title
Meetings EMT Workshop
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. The aging condition of the Senator building would require extensive capital <br />outlay in order to extend its useful life and increase efficiency. <br />W.E.Group of Portland OR. was hired in 1993 to prepare the fust long range facility plan for the <br />county. Several options were considered for the downtown campus. The consultants <br />recommended a plan which envisioned the vacation of the Franklin and Senator Buildings and <br />the construction of a new public service building on the Senator block. It was suggested that <br />redevelopment of the Senator block be conducted in two phases over 10 years. The plan <br />indicated that the county would need at (135,000 ns~ to meet its 20 yeaz growth projections. <br />Following the wmpletion of the WB. Group faciliry report, the county chartered a 23 member <br />facility steering committee to gain further citizen input and evaluate the W.E.Group report. <br />Over 90 citiz2n, government and business representatives worked from May of 1994 to April of <br />1995 reviewing facilities options and issues. The square footage needs were downgraded to <br />109,360 nsf by the committee using an annual growth rate of less than 1%/yr. During the <br />course of these studies, (1993-1995) several options for the downtown campus facility needs <br />were studied. They include: <br />1. Purchase the Equitable Building <br />2. Construct a new public office building <br />3. Renovation of the Senator Office Buildings <br />4. Lease additional office space, as needed, in the downtown core <br />5. Build a new justice (criminal wurts) building to replace the courthouse <br />The facility steering committee concluded that the purchase of the Equitable Building or the <br />construction of a new public service building best met the facility needs of the county in the <br />downtown core. They also recommended the county assess the cost and value associated with <br />purchase of We Equitable Building before proceeding with the development of a new building. <br />The cost associated with purchase and renovation of the Equitable Bldg. was estimated at $11.6 <br />million. Tlus purchase would have provided the county witli 114,000 nsf, including the ground <br />floor retail, and 147 on-site parking spaces. Concerns were expressed by W.E. Group that <br />e~ctensive seismic and ADA upgrades would be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.