My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, ~~ ' - <br />~ ~~ <br />(~~ Plan D Options <br />(New Courthouse) <br />~ <br />, ~ ~v <br />l~~v; , <br />. ~- ~ <br />~' f`~ ~ <br />U ~~ <br />V~ <br />Proposal: Move all court functions from the existing Courthouse and conshvct a new <br />Courthouse on tlie Senator Block. <br />Aualysis: WEGroup has been asked to conduct a preluninary cost study of this option. <br />The work plan includes the following: <br />1. Cost to bring existing Courthouse up to current codes including: <br />a. Earthquake standards <br />b. fire/life/safety standards <br />2. Cost to remodel existing Courthouse to accommodate County offices. <br />3. Check assumptions listed below. <br />The county staff has evaluated various options for moving administrative <br />offices [o the Courdiouse and other locations based on the year 2013 space <br />needs as defined in E~chibit 10 of the WEGroup report. <br />Assumptions: For the purpose of this analysis, certain assumptions have been made <br />regarding space needs, building costs and department locations. These <br />assumptions are for feasibility analysis only. <br />1. Option D` assumes that a tri-agency facility would be constructed. <br />Option DZ assumes the Sheriff retains offices (17,000 NSF) in the <br />Courthouse. <br />2. Both options assume the District Attorney will consolidate all offices in <br />the Courthouse. <br />3. The Senator Building will be demolished to accommodate a new Court- <br />house. <br />4. The Courthouse does not contain sufficient space to accommodate all <br />departments displaced by the demolition of the Senator building. <br />5. The cos[ of a new Courthouse is based on the costs set forth in option <br />C of the WEGRoup report (117,000 GSF x$135= $15,795,000 plus <br />project overhead $ _ $20,534,000. <br />6. Relocation of the Courts will free up approximately 46,000 NSF in flie <br />Courthouse. <br />7. Approximately 70,000 NSF of space will be remodeled in the existing <br />Courthouse for county offices. <br />~ <br />z <br />
The URL can be used to link to this page
Your browser does not support the video tag.