My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
li <br />t <br />' <br />, <br />COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />CERTIFICATE OF SUBSTANTIAL COMPLETION <br />September 27, 2000 <br />Page 3 of 3 <br />A list of items to be completed or corrected is attached heretd. The failure to include any items on such list does not alter the <br />responsibility of the Contractor to complete all Work in ~cor~ance with the Contract Documents. <br />' ARCHITECT <br />' <br />~ <br />' <br />' <br />CI <br />I~~ <br />~J <br />' <br />~ <br />' <br />~ <br />' <br />' <br />Signature df Architect <br />Date <br />The Contractor will complete or correct the Work of the Contract, as supplemented by the list of items attached hereto, in so <br />far as they are part of the Contract as amended, by November 27, 2000. <br />CONTRACTOR <br />~ ~ <br />Signature of Contractor Date <br />The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof <br />at 12:00 a.m. PDST (time) on September 27, 2000 (date). <br />OWNER <br />Ib~~~ <br />Signat re of Marion County Date <br />OWNER ""~ <br />_ /r q ~o~ <br />Sign tu e of Salem Area Mass Transit Date <br />The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and <br />insurance shall be as follows: <br />The security, maintenance, heat utilities, damage to the Work and insurance is the responsibility of the Owner as of September <br />27, 2000, at 12:00 a.m. PDST with the exception of the punch list items still remaining to be completed. <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.