My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />'~ ~. <br />COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />FIELD OBSERVATION REPORT NO. 29R (1) <br />August 8~ 2000 <br />Revised September 8, 2000 <br />Page 8 of 9 <br />73. Evidence Room 3134: <br />a. Door 3134A requires final coat of finish, both faces. <br />b. Shelves in cabinets are not thick enough when they span over 32". <br />c. Deep work surface requires continuous support u~der front edge of table. The exposed comer was <br />supposed to be rounded as opposed to chamfered. <br />d. Control for exhaust in Evidence Room appears to missing unless it is operating continuously. <br />e. South wall requires touch up paint in a number of different areas where has been scuffed up. <br />f. Under the small alcove there are scuffed areas which need to be touched up. <br />74. ~deo Room 3144: <br />~ a. Door face will be rejected with a large chip of a veneer pulled out of it. <br />b. Pop down ceiling tile is up to high. Straighten electrical box covers and drop ceiling tile where it is sitting <br />about'/+" high. <br />~ 75. Video Room 3153: <br />a. Door 3153 requires final coat of finish, both faces. <br />~ 76. Ha113143: <br />a. Nothing to Report. <br />~ 77. Ha113154: <br />~ a. Nothing to Report. <br />78. DA Expansion 3122. <br />~ a. Missing louvers in bay window sofflt. <br /> b. Gouges in partition below west bay window, openings need to be patched and painted. <br /> c. Rust marks on aluminum curtain rod need to be cleaned off. <br /> d. Clean scuff marks from rubber base. <br />~ e. Patch and paint scuff marks on column covers. <br /> f. At wall adjacent to exit stair repair gouge and patch paint <br /> g. At south bay window patch at soffit where aluminum tube comes into ceiling, ~epaint. <br />~ h. Vacuum sawdust off floor around pallets. <br /> i. Door 3122A, door frame requires final coat of paint. <br /> j. Ceiling incomplete. <br />' 79. Reception Area 3120: <br /> a. Door 3122B requires final coat of finish both faces. <br />~ b. Door Frame 31226 requires some touch up and final coat of paint. <br /> c. Touch up paint on east wall. <br />~ 80. Office Area 3110: <br />a. Touch up paint under large window. <br />b. Patch in southwest comer where additional aluminum tube reaches soffit Soffit needs to be patched and <br />I painted. <br />c. Touch up paint adjacent to south side of bay window. <br />d. Head of large window needs to be cleaned and painted. <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.