My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_,' <br />' COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />FIELD OBSERVATION REPORT NO. 29R (1) <br />~ August 8, 2000 <br />Revised Sep~ember 8, 2000 <br />Page 6 of 9 <br />' <br />52. <br />~ 53. <br />~ 54. <br />~ <br />, <br />55. <br />~ <br />~ 56. <br />~ <br />~ 57. <br />~ <br />58. <br />~ <br />59. <br />~ <br />~ 60. <br />, 61. <br />, 62. <br />' <br />General Office Area 3173: <br />a. Scuff mark on south wall to be patched. <br />b. Paint overspray on wali angie at ceiling near northeast comer. <br />Office 3182: <br />a. Door frame has been scuffed needs to be buffed or paint patched. <br />b. Patch paint severai locations on west wall. <br />Office 3192: <br />a. Door veneer has aiso been stripped back at latch height. <br />b. Split veneer on back edge of door on top side. <br />c. inside face of door requires final coat of finish <br />d. Remove white paint from dopr frame. <br />e. Ove~pray on ceiling grid at northwest corner to be removed. <br />Office 3193: ~ <br />a. Inside face of door still requires final coat. <br />b. Door frame requires final coat of paint. <br />Offlce 3183: <br />a. Door doesn't appear to have its final coat of finish. <br />b. Patch paint scuffs on the north and south walls. <br />c. Door frame appears to have a couple of scuff marks on it as well. <br />Office 3163: <br />a. Door slightly brushes carpet, plane to clear. <br />b. The wall angle in the southeast comer needs to be adjusted where it goes around the permanent material <br />and paint needs to be cleaned off the grid of wall angle. <br />Hallway 3174: <br />a. Patch paint on the north wall directly near the receptacle and clean scuff mar{cs on rubber base. <br />Office 3164: <br />a. Door requires final coat of finish, both faces. <br />b. Patch paint small spot on north wall. <br />Office 3184: <br />a. South wall requires some paint touch up to repair nail hole. <br />Office 3194: <br />a. Nothing to report. <br />General Office Area 3175: <br />a. Touch up smudges on walls in several loca6ons. <br />
The URL can be used to link to this page
Your browser does not support the video tag.