My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
., <br />COURTHOUSE SQUARE <br />~ i <br />PROJECT NO. 9828 <br />FIELD OBSERVATION REPORT NO. 29R (1) <br />~ August 8, 2000 <br />Reviseci September 8, 2000 <br />Page 5 of 9 <br />43. <br />~ <br />~ <br />44. <br />' <br />~ <br />~ <br />45. <br />' 46. <br />i <br />' <br />47. <br />, <br />~ 48. <br />~ <br />~ 49. <br />` 50. <br />~ 51. <br />~ <br />, <br />Conference Room 3282: <br />a. Door frame scuffed and requires refinishing. <br />b. Door is insufficiently finished on the exterior face of it, sand and refinish. <br />c. Interior face of door insuffiaent finish, sand and new coat <br />d. Clean perimeter angte on north face of room. <br />Work Room 3281: <br />a. Shelves should be 1" thick material. <br />b. Touch up paint above backsplashes where glue has been removed from surface. <br />c. Touch up paint to remove pencil marks on west wall. <br />d. General cleaning and vacuuming of room. <br />General Office Area 3180: <br />a. Door 3180A, frame needs to be clea~ed and refinished. <br />b. Repair and patch paint nicks just above base board on all four wal~s. <br />c. Paint door frame 3281A to remove wall paint overspray. " <br />Office 3191: <br />a. Door 3191A both faces require finaf coat of finish. <br />b. Touch up paint at column cover. <br />Office 3181: , <br />a. Door 3181A, final coat of finish on both faces is required. <br />b. ~ Overspray of paint on ceiling grid to be cleaned off. <br />c. Paint patch on east wall. <br />Office 3160: <br />a. Glue or urethane imperfection on outside face of door approximately dead center. <br />b. Door brushes carpet, plane to clear. <br />c. Patch paint to cover adhesive on north wall. <br />Haliway 3171: <br />a. Nothing to report. <br />Office 3161: <br />a. Door frame is scuffed up and requires either buffing or patch painting. <br />Office 3162: <br />a. Patch paint scuff on north wall. <br />b. Patch paint directly above light switch plate. <br />c. Patch paint calumn cover west face. <br />d. Check comer broken from ceiling tile, replace ceiling tile. <br />e. Check the ceiling tile strips that are only about 1" to 1%" wide it appears they are not wide enough to fit <br />into the gap. <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.