My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~, <br />° 1 <br />' ' COURTHOUSE SQUARE <br />PRO)ECT NO. 9828 <br />' FlELD OBSERVATION REPORT NO. 36 <br />September 6, 2000 <br />Page5of5 <br />' <br />' 31. Waiting Area 2242: <br />' <br />a. Door 2242 B~ leading edge needs to be sanded and refinished with a final finish coat and there is a lot of <br />dust on the door. Correlate with the paint color on the maple frames that are around the Tax Office <br />' openings. <br />b. Second tax window needs fiiler applied at the plastic laminate. <br />' 32. General items: <br />a. Specification Section 12351, Pargraph 2.6.E requires shelves befinreen 30" and 48" wide to be 1" thick <br />material. <br />' b. General cleanliness of completed areas does not meet the expected move-in standard. Clean up tape, or <br />adhesive left by tape, scuffs, glue residue, etc. <br />c. Carpets will need final vacuuming. <br />' d. Noted that many leading door edges have only received one coat of finish. Send and finish per <br />speafications with smooth finish. <br />e. Door frames have been scuffed by carpet instali process. <br />' 33. End of punch list for offlce areas of the second floor. Punch list of the core areas has not been carried out at this <br />time, will be carried out with the third floor. <br />' <br />' <br />C' <br />' <br />cc: Billy Wasson, Marion County <br />' John Whittington, S.A.M.T.D. <br />Craig Lewis, Melvin Maric Development Corp. <br />Bob McCune, Marion County <br />Century West Engineering <br />' Interface Engineering <br />Westech Engineering <br />Pence/Kelly Construction <br />' *~ <br />By: <br />File: 9828-9A <br />This confirms and rec:ords our interpretation of the discussions which occurred and our understanding reached during this meetlng. <br />' Please nofify in writing within seven days of the date indicated above if the interpretatlon or description is incomplete or inaccurate. <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.