My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T - ~ <br />; <br />-~NC~/KELLY Meeting Minutes <br />, CONSTRUCTION, INC. NO. H3 <br />2fa7 P.na. l.oop sE, sa~.m. ort nso2 (609~ siY-rns <br />~Pertl~nd (60~) 221i6B7 ~ Fax (609) 686-7471 <br />«w «.aus <br />Project Manager: Dave Hays <br />Courthouse Square MEETING DATE: 10/26/00 <br />LOCATION: Arbuckle Costic ~U~'JECT: Construction Meeting <br />. <br />~ <br />Y <br />. <br />BW <br />. ~ . <br />Bill Wasson <br />, •. . <br />Marion Coun <br />Y BMC Bob McCune Marion Coun <br />Y BC B ron Courts Melvin Mark Com anies <br />Y CL Crai Lewis Melvin Mark Com anies <br />Y DH Dave Ha s Pence/Kell Construction, Inc. <br />N JH Jeff Hamm Salem Area Transit <br />Y JG John Gremmels Pence/Kell Construction, Inc. <br />Y JW John Whittin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckle Costic Architects <br />N O Oliver Raab P.E. Interface En ineerin , Inc. <br />N RC Rand Curtis Marion Coun <br />Y SS Steve Schaad Pence/Kell Construction, Inc. <br />N TT Tim Terich Centu West En ineerin <br />'~ITEM DESCRIPTION STATUS START DUE BALL IN COURT <br />• i~ ~~ ~ ~ - . . <br />PERMIT STATUS <br />B00.00 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />SCHEDULE REVIEW <br />D00.00 • OLD 4H4199 Pence/Kelly Construction~ Inc. JG <br /> CIVIL CONCERNS <br />E00.00 OLD 4/14/99 Pence/Kell Construction, Inc. JG <br /> STRUCTURALCONCERNS <br />F00.00 OLD 4/14/99 Pence/Kell Construction, lnc. JG <br /> ARCHITECTURAL CONCERNS <br />F74.02 OLD 8/30/00 Arbuckle Costic Architects LL <br /> LL to issue more info on the tactile map for the kiosks. <br />character with rest of kiosks. Possible upcharge if maps/frames are out of <br />F80.02 CLO 10/11/00 Pence/Kell Construction, Inc. JG <br /> The tile in the elevator floors was specified at 3/8" and the cab was built that way. The tile does not come in <br />3/8". There are cost to alter the cabs. <br />Cabs have been altered <br />F83.01 NEW 11/1/00 Pence/Kel) Construction, Inc. JG <br /> P/K will proceed with replacement of the Transit Columns per COR 370. The Formica Laminate will be used <br />at an additional cost of $1080. The Columns will be installed 11/6. <br />F83.02 NEW 11/1/00 Pence/Kell Construction, Inc. JG <br />Signage: <br />- Temp Ordinance Signs will be installed. Steel signs will be intalled the week of 11/6. <br />- Kiosk frames will be installed 11/2 or 11/3. kiosk will be leveled at that time. <br />- linterio~ Signs and directories will be installed week of 11/6. <br />- Plaques: Enamel Wash didn't work <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.