Laserfiche WebLink
Y • • <br />Page: 10 <br />~ 7. <br />8. <br />9. <br />10. <br />11. <br />Record of temperature and weather <br />Date of test <br />Identification of the product tested <br />Test location in Project <br />Type of test <br />Observations regarding compliance with Contract Document <br />C. Include the following on Inspection Reports: <br />1. Date issued <br />2. Project title and location <br />3. Inspection firm's name and address <br />4. Inspector's name <br />5. Date of inspection or sampling <br />6. Record of temperature and weather <br />7. Date of inspection <br />8. Type of inspection <br />9. Observations regarding compliance with Contract Documents <br />10. Evaluation of the work <br />D. In addition to the written repo~ts, immediately notify the Design <br />Consultant, Project Manager and Contractor of any portions of the work <br />found to be in nonconformance with the Contract Documents. <br />u <br />111. EVALUATION CRITERIA <br />Selection shall be made on a numerical basis (99 points total) using the following criteria: <br />FIRM QUALIFICATIONS: Is the firm qualified to do the work as defined in the Project <br />Manual, approved by the State of Oregon and City of Salem (as applicable) and <br />appropriately certified to perform the work requested? (33 points) <br />FIRM AVAILABILITY: Does the firm have the staff available to pertorm the work in a <br />timely manner? (33 points) <br />FIRM REFERENCES: Do the references given by the firm support the data given by the <br />firm? (33 points} <br />A committee consisting of the foltowing individuals will evaluate the proposals: <br />Bilty Wasson, Project Manager - Marion County <br />John Whittington, Project Coordinator - Salem Area Mass Transit District <br />Craig Lewis, Project Manager - Melvin Mark Development Co. <br />Rick Wessell, Director of Construction - Melvin Mark Development Co. <br />The Evaluation Committee will evaluate Proposals in accordance with the evaluation criteria <br />set forth above. The evaluation committee may conduct interviews if needed to determine the <br />most qualified firms. All firms to be interviewed will be notified of interviews by telephone. <br />