My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Carlson Testing -Contract
>
CS_Courthouse Square
>
Carlson Testing -Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:43:23 AM
Creation date
8/2/2011 3:56:58 PM
Metadata
Fields
Template:
Building
RecordID
10070
Title
Carlson Testing -Contract
Company
Carlson Testing
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />H. ASPHALT PAVEMENT <br />Page: 9 <br />1. Test required: <br />a. Core Samples. Number and document location of each core <br />sample for future reference. <br />b. Measure thickness of each core sample for conformance to the <br />specification requirements <br />I. STRUCTURAL STEEL <br />Perform structural steel inspection and testing <br />NOTE: There is the potential that the selected Consultant may be required to work <br />in close proximity to petroleum contaminated soils. How would your firm handle <br />work in impacted areas? Please include any additional fees associated with such <br />work in your fee proposal. <br />2, RESPONSIBILITY: The Consultant shall provide obsenration and testing in <br />conformance with the contract documents. <br />TESTING STANDARDS: All testing shall be performed in strict accordance with <br />the standards tisted in this RFP and in contract documents provided for the Courthouse <br />Square development, prepared by Arbuckle Costic Architect, dated December 30, 1998. <br />Where no testing standards are listed, consultant must conform to the ASTM standard <br />that is applicable to the tesf being performed. The selected firm must be ICBO certified. <br />LIMITS OF AUTHORITY: The consultant is not authorized to: <br />1. Release, revoke, alter or enlarge on requirements of the Contract <br />Document <br />2. Approve or accept any portion of the work (as relates to the <br />Contractor's obligation to conform to the Contract Documents) <br />3. Perform any duties of the Contractor <br />3. REPORTING: <br />A. Promptly submit, unless othen~vise indicated, a written Inspection and <br />Test Report to each of the following within forty-eight (48) hours of <br />inspection or test: <br />1. Project Manager <br />2. Design Consultant <br />3. Contractor <br />B. Include the following on Test Reports: <br />1. Date issued <br />2. Project title and location <br />3. Testing laboratory name and address <br />4. Inspector's name <br />5. Date of inspection or sampling <br />
The URL can be used to link to this page
Your browser does not support the video tag.