Laserfiche WebLink
D. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6, <br />7. <br />FAJC 50~ 884 4357 <br />Clarifications 8 Corrsiderations <br />SELECTRON <br />~oos <br />Powsr and Conduit. 120VAC power at the controi equipment locations, conduit <br />and fire wal~ penetrations are the responsibility of others. No local power is <br />required at the individual camera locaio accom odat rthe number ofvudeo own <br />on the plans wiil need to be e~larged <br />cables required. <br />CSI Access Control SYstem ~n~rfa~ ut ~entrol of t e CCN systerna An alarm <br />system expansion to p~ovide inpuUou p <br />condition sensed by the CSI system will cause the CCN system to switch the <br />appropri2~te Camera to the appropriate monitar and switch the digital recorder to <br />real-time recording of the alarm cond~tnecessary forrth s appl cation-~If desi ed, it <br />The CSI CCTV software option is not <br />can be ~dded for an investment cost of $ 7,800. including a network file server. <br />Control Equipment Conflguratio ~ ~eh32 camera syst~emefEach~ r~eco der wil{ <br />recorders will be cas~aded ir~to a s~ g <br />have a 24G8 DAT drive for arch~Yn to sY d smlay~n9 all 22 ca m ~a ) a d oneng <br />s t a t i o n w i l l h a v e t w o 2 U c o ~ o r m o ( P <br />s y stem control keybaard (cantrolling both multiplexeNrecor ders). <br />In this configuration, only one keybo~a ~Rored at the ot e stafionivComP~g ee <br />Changes made at one statcon wdl b <br />simultaneo control of all functions of all ~T!'~e a Pelco 8500 (2X~)'mpaViX r/ <br />recorders from both workstations would req <br />switcher at an additinnal system investment of $ 6.689. installed. <br />7he 5120 reception ivom will have ry'14firQ~ the two~eceptiona a cameras, <br />sequentiat switcher for v~ewmg ac t}- <br />qlternate #1 Bid. Selectron has had i nt an'dntrovide arb d at this t me ecific <br />app lica tio n a n d p e rf a~ m a n c e r e q u i r e m e P <br />Training. Selectron has included four hours of system training in this praposal. <br />Additional training, if desired, is ava+lable at our standard billab{e rates. <br />Warranty. Afl Selectron p~ovided equ~pment is factory warranted for one year <br />from date of shipment. Selectron ti~snallation labor is waRanted fnr one year from <br />date of substantial system comple <br />Terms b Conditiona. Freight is F.O.B., jobsite. TeRns are Net 30, progressive. <br />Equipment received and labor performed will be inv~ot o d on the 25`" of each <br />month, with a 5°k set-a-side pending system ~omp <br />