Laserfiche WebLink
[ ~~~~~.g <br />~ ~ ~~~' f <br />~ ~-- <br />Issues Related to CCTV and <br />Community Television Equipment <br />in Courthouse Square <br />Preliminary list for May 20, 1999 <br />Other issues may be defined by TV engineers. <br />1. Task allocation: <br />TV equipment -- CCTV <br />House audio system--ready access for CCTV for TV signal adjustment <br />Audio visual system-direct feed to TV equipment <br />2. Timeline <br />Engineers recommended a minimum of 13 weeks for installing and testing TV equipment; <br />rooms must be substantially complete <br />In Portland, late completion caused TV installation time to be lost; MANY subsequent <br />problems due to inadequate time <br />CCTV cannot afford to be fixing a system flawed by rushed installation <br />3. Space <br />Control room--need adequate space for 4 bays (closed captioning ready) <br />Access to get behind racks--wheels may not work <br />Need to decide audio--roll around cart?? for TV only? PA also? <br />4. Arrangement of ineeting room <br />deternunes mounted, robotic camera locations <br />determines cabling routes to control room <br />5. HVAC <br />24 hours a day <br />separate zone with adequate cooling capacity--computer room rating or greater <br />6. Access to fiber optic cable <br />