My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~. <br />~ <br />., <br />~ centurywest <br />ENGINEERING CORPORATION <br />7uly 21, 1997 <br />Mr. Mike Staton <br />Staton Construction <br />29394-B Airport Road <br />Eugene, OR 97402-9594 <br />RE: Basement and Shoring Removal <br />' Bid Clarifications <br />Courthouse Square Demolition Project <br />Dear Mr. Staton: <br />Thank you for responding to the request to provide a bid for additional work on the Courthouse <br />Square project. The purpose of this correspondence is to request additional clarification to the <br />design team regarding your bid for the removal of the basements and shoring from the above <br />referenced project. Please respond in writing to the following list of questions prior to July 30, <br />1997: <br />1. Is this bid based on time and ma.terials, not to exceed the price indicated? Is this <br />reasonably what the County can expect to pay? <br />2. Your bid includes mobilization, since you are already on the job site, what would be <br />included in this mobilization charge? <br />3. Please provide the following unit prices for removal of the basements and shoring. What <br />will it cost for removal of walls and footings if they are disturbed? What are your <br />equipment and labor rates? <br />4. How much credit will be provided to the original demolition contract for not providing the <br />shoring and bracing as originally specified? <br />5. An effort is going to be made to identify the depth of the slabs in the basements. The plan <br />is to remove any slab at a depth less than eleven feet. Would the decision to leave slabs <br />oF sowtaws <br />L E A D I N G T H R O U G H E F F E C T I V E S O L U T I O N S <br />1593 Clay Street NE Salem, Oregon 97301 Phone: (503) 540-0995 FAX: (503) 589-1657 <br />
The URL can be used to link to this page
Your browser does not support the video tag.