Laserfiche WebLink
~. <br />~ <br />., <br />~ centurywest <br />ENGINEERING CORPORATION <br />7uly 21, 1997 <br />Mr. Mike Staton <br />Staton Construction <br />29394-B Airport Road <br />Eugene, OR 97402-9594 <br />RE: Basement and Shoring Removal <br />' Bid Clarifications <br />Courthouse Square Demolition Project <br />Dear Mr. Staton: <br />Thank you for responding to the request to provide a bid for additional work on the Courthouse <br />Square project. The purpose of this correspondence is to request additional clarification to the <br />design team regarding your bid for the removal of the basements and shoring from the above <br />referenced project. Please respond in writing to the following list of questions prior to July 30, <br />1997: <br />1. Is this bid based on time and ma.terials, not to exceed the price indicated? Is this <br />reasonably what the County can expect to pay? <br />2. Your bid includes mobilization, since you are already on the job site, what would be <br />included in this mobilization charge? <br />3. Please provide the following unit prices for removal of the basements and shoring. What <br />will it cost for removal of walls and footings if they are disturbed? What are your <br />equipment and labor rates? <br />4. How much credit will be provided to the original demolition contract for not providing the <br />shoring and bracing as originally specified? <br />5. An effort is going to be made to identify the depth of the slabs in the basements. The plan <br />is to remove any slab at a depth less than eleven feet. Would the decision to leave slabs <br />oF sowtaws <br />L E A D I N G T H R O U G H E F F E C T I V E S O L U T I O N S <br />1593 Clay Street NE Salem, Oregon 97301 Phone: (503) 540-0995 FAX: (503) 589-1657 <br />